![Hioki RM3542-50 Instruction Manual Download Page 31](http://html1.mh-extra.com/html/hioki/rm3542-50/rm3542-50_instruction-manual_2137361031.webp)
2.3 Turning the Power On and Off
25
2
Turning Power On
When the power is turned on, the same setting as when the power was last turned off
appears (backup function).
When powered up for the first time, the default settings appear.
See:
Before Starting Measurement
To obtain precise measurements, provide about 30 minutes for warm-up after turning the
power on.
Measurement settings are recalled from when the power was last turned off (settings
backup).
However, measurement settings made through the RS-232C or GP-IB interfaces are not
retained, although they can be stored using the
:SYSTem:BACKup
command (p. 149).
Turning Power Off
Press the
POWER
button (it lights up in red, power OFF).
Disconnect the power cord from the power inlet to extinguish the
POWER
button light.
When the power is turned on again, operation resumes with the same settings as when last
turned off.
2.3 Turning the Power On and Off
Press the
POWER
button (it lights up in green).
Self-test
Indicates an error (p. 197).
After Power-On
A self-test (instrument diagnostic routine) is performed.
During the self-test, the following information is displayed while the hardware is verified.
Error
No Errors
Normal display (measurement screen)
The following information is displayed during self-
testing:
•
Manufacturer and model name
•
Firmware versions (main, and measurement)
•
Communication setting
•
Power Line Frequency Setting
If a power outage (e.g., breaker trip) occurs when the instrument is turned on, it will automat-
ically turn on again when the power is restored without pressing the
POWER
button.
Summary of Contents for RM3542-50
Page 1: ......
Page 2: ......
Page 6: ...Table of Contents iv...
Page 26: ...1 3 Screen Organization 20...
Page 32: ...2 3 Turning the Power On and Off 26...
Page 48: ...3 8 Confirming Faulty Measurements 42...
Page 72: ...4 14 Compensating for Thermal EMF Offset Offset Voltage Compensation OVC 66...
Page 84: ...5 7 Initializing Reset 78...
Page 94: ...6 4 Auto Exporting Measurement Values at End of Measurement Data Output Function 88...
Page 206: ...11 4 Disposing of the Instrument 200...
Page 216: ...Appendix 5 Dimensional diagram A10 Appendix 5 Dimensional diagram Unit mm...
Page 230: ...Index Index 4...
Page 231: ...HIOKI E E CORPORATION...
Page 232: ......
Page 233: ......
Page 234: ......