Hills PARALINE DUO Owner'S Manual Download Page 6

PIVOT BRACKET

OVAL CAP

SPACER

WALL 
BRACKET

END FRAME - LONG

END FRAME - SHORT

SPACER TUBE - SHORT

DETAIL ENLARGED

SEE DETAIL

SQUARE CAP

BOLT - F & NUT - B

BOLT - C & NUT - A

LINE TENSIONER

TELESCOPIC STRUT

DO NOT USE THIS HOLE

WHEN WIRING THE CLOTHESLINE

9

ASSEMBLY DETAILS

BOLT - D

BOLT - B

NUT - A

NUT - A

FIXED STRUT

END
PLUG

NUT - A

BOLT - E

LINE

START

FINISH

START

FINISH

SPACER TUBE LONG

NOTE: TENSIONERS
MAY BE USED ON
LEFT OR RIGHT
HAND END OF
FRAME

LINE TIE OFF METHOD
STEP 1:
THREAD LINE THROUGH
TENSIONER AND PULL
TIGHT. 
FORCE THROUGH GROOVE
IN TOP.

STEP 2:
KEEP LINE TIGHT AND
THREAD THROUGH THE
TWO HOLES AS SHOWN
BELOW. 
TRIM OFF EXCESS LINE.

WIRING DETAILS

IMPORTANT: DO NOT OVER TENSION LINE.

GROOVE

TRIM

TENSIONER

TYPICAL LINE TIE OFF DETAIL

Summary of Contents for PARALINE DUO

Page 1: ...ind there are missing or damaged parts PLEASE CALL Hills direct on 1300 300 819 cost of a local call for assistance during normal business hours HILLS INDUSTRIES LIMITED do not recommend the application of a canopy on any of their outdoor dryer range Unless any addition or attachment to this product has HILLS specific approval or is sold as a HILLS product the warranty on this product is waived Th...

Page 2: ...E TENSIONER AND RE TIE SEE DIAGRAM 9 IMPORTANT DO NOT OVER TENSION THE LINE AS THIS MAY BOW THE END FRAMES WE DO NOT RECOMMEND THE USE OF OIL OR WD TYPE LUBRICANTS ON ANY PART OF THE PARALINE WIPE AWAY ANY DIRT AND DUST FROM THE TELESCOPIC STRUTS WITH A DAMP CLOTH ONCE A MONTH MORE REGULARLY IN DUSTY CONDITIONS INSPECT YOUR PARALINE REGULARLY FOR SIGNS OF DAMAGE OR WEAR DO NOT USE YOUR PARALINE IF...

Page 3: ...ND CAP SQUARE 2 END CAP OVAL 2 SQUARE END PLUG 1 2 x 1 2 2 SPACER O25 x 12 5 PLASTIC 2 LINE TENSIONER 4 FASTENER CHART DRAWN FULL SIZE BOLT D BOLT E BOLT B BOLT C NUT B NUT A BOLT F OPTIONAL MOUNTING KITS SPARE PARTS ARE AVAILABLE FROM YOUR DEALER REFER TO THE LIST BELOW FOR REQUIRED REPLACEMENTS PART NAME ORDER KIT NUMBER POLY CORE LINE 40M BEIGE FD902716 LINE TENSIONER FD901932 A MORE COMPREHENS...

Page 4: ...EL AND VERTICAL NOTE MASONRY ANCHORS ARE NOT INCLUDED WITH THIS PRODUCT CONSULT YOUR LOCAL HARDWARE SPECIALIST FOR ADVICE ON WHICH MASONRY ANCHORS ARE MOST SUITABLE FOR YOUR PARTICULAR TYPE OF BUILDING STRUCTURE INSTALLATION RECOMMENDED FOR BRICK WALL AND POST MOUNT ONLY 2 MARK POSITION OF WALL BRACKETS WALL MOUNT DETAIL MAKE ALLOWANCE FOR SLOPING GROUND RECOMMENDED MOUNTING HEIGHT USERS HEIGHT PL...

Page 5: ... BOLTS ONCE FITTED LAY STRUT BACK AGAINST THE WALL PIVOT BRACKET WALL BRACKET TELESCOPIC STRUT LINE TENSIONER LINE TENSIONER 8 FIT SPACER TUBES TO END FRAMES 6 FIT LINE TENSIONERS OVAL CAPS AND PIVOT BRACKETS TO END FRAMES MAKE LEFT AND RIGHT HAND PAIR BOLT B SPREAD END FRAMES APART AND PUSH SPACER TUBE INTO THE ENDS NUT A OVAL CAP END FRAME SHORT END FRAME LONG END FRAME LONG END FRAME SHORT NOTE...

Page 6: ...LT D BOLT B NUT A NUT A FIXED STRUT END PLUG NUT A BOLT E LINE START FINISH START FINISH SPACER TUBE LONG NOTE TENSIONERS MAY BE USED ON LEFT OR RIGHT HAND END OF FRAME LINE TIE OFF METHOD STEP 1 THREAD LINE THROUGH TENSIONER AND PULL TIGHT FORCE THROUGH GROOVE IN TOP STEP 2 KEEP LINE TIGHT AND THREAD THROUGH THE TWO HOLES AS SHOWN BELOW TRIM OFF EXCESS LINE WIRING DETAILS IMPORTANT DO NOT OVER TE...

Reviews: