3
Installation
Select a Suitable Location
Minimum recommended clearance on all sides
of the Hoist is 1m (3'-3") (
Fig. 1
).
Install the Main Standard
1.
Dig a 200mm (8") by
800mm (32") hole (
Fig. 2
).
2.
Dig the hole deeper than 800mm
if you would like the clothesline to sit
lower in the ground.
4.
Insert main standard
796
into the hole.
5.
Concrete into position.
Concrete should be damp enough to
hold together when squeezed in
your hand.
Settle the concrete by pushing a thin
stick into the mix several times.
Ensure the main standard is vertical.
5.
Wait 48 hours for concrete to set.
Fig. 2
Wind brake
Check the Hoist
is vertical
Main Standard
796
Indents
200mm (8")
1.6m
8
00
mm (
3
2
")
6
5
0mm (26
")
co
n
cr
et
e
15
0
m
m
(6
")
gr
ave
l
Ground level
1m (3'-3")
Heritage 6-Line
4.0m (13'3")
Heritage 7-Line
4.5m (14'9")
1m (3'-3")
Fig. 1
3.
Fill with 150mm coarse gravel