3
Installation
Step 2 – Select a suitable location
2.1
Select a suitable location for your Post
mounted Folding Frame Clothesline.
2.1
Ensure you have left sufficient space
surrounding the Clothesline (
Fig. 1
).
We recommend 0.1m each side and
0.75m in front.
Product Dimensions
Product
Width
(mm)
Depth
(mm)
Double Folding Frame
Clothesline
2250
1200
Single Folding Frame
Clothesline
2250
1200
Compact Folding Frame
Clothesline
2240
680
Carton contents
Part name
Qty.
Post - fixed
2
Cross brace
1
Product manual
1
Post kit accessory bag (includes):
2 x M8 x 75 ZP socket head screw
2 x M8 x 55 ZP socket head screw
4 x M8 ZP nyloc nuts
1 x hex key 6mm
8 x M8 washer
1
M8 nyloc nut
M8 washer
M8 x 55 socket
head screw
M8 x 75 socket
head screw
Step 1 – Unpacking the Folding
Frame Clothesline Post Kit
Check all components are in the carton
(refer to tables above for your model).
Post Kit not suitable for Long and Mini
Folding Frame Clotheslines.
Fig. 1
Depth
Wi
dt
h
750mm
(30") minimum
100mm
(4") minimum
Ensure area is free from pipes and obstructions