10
PRE-POWER CHECKLIST
Before powering-up the case, be certain that all of the steps listed below
have been completed to ensure proper case functionality, safety and com-
pliance with warranty terms.
Have you thoroughly examined the case for shipping damage? (see
pg.
Have you removed and discarded the casters? (see pg.
Have you checked the vertical plumb of the case? The horizontal
level? (see pg.
)
Have you applied the foam tape gasket and sealant between adjoining
cases? (see pg.
)
Have you sealed the case-to-case joints by applying caulk and acrylic
tape to the pipe-chase seam? (see pg.
)
Have you removed the shipping blocks from the refrigeration lines?
(see pg.
)
Have you sealed any tank penetrations? (see pg.
ATTENTION!
Be certain to clear the case of any loose
packaging or case materials before ener-
gizing the case. Failure to do so may re-
sult in case damage or malfunction.
Summary of Contents for VNRB
Page 2: ...ii ...
Page 5: ...v Revision History new manual format_9 19 ...
Page 51: ...H2 SEISMIC BRACKETS 4 BRACKETS ...
Page 52: ......