Step 1:
Attach Lift Handle (A) to Screen (B); tighten with Nut M6 (J), as per Fig. 1
Step 2:
Attach Frame Ring (E) to
Decorative Frame (F) using Bolts (I). Do not fully tighten the bolts.
Step 3:
Connect Base (G) to Decorative Frame (F) using Bolts (I) and Nut (J). Fully tighten all bolts
.
Step 4:
Place D, C, and B on the assembled frame. The fire
pit
is now ready for use.