Installation -> Wall Mounting
1.
Drill holes on the wall and install
gang box
.
2.
Secure the
mounting plate
on the gang box and wall.
3.
Route the
cables
through the cable hole of the
mounting plate, and connect to the corresponding
external devices.
4.
Align the device with the mounting plate and hang
the
terminal
on the mounting plate.
5.
Use screwdriver to
secure
terminal on mounting plate.
Summary of Contents for DS-DM0710BL
Page 1: ...Temperature Screening MinMoe Configuration...
Page 2: ...CONTENTS Introduction Preparation Installation Local GUI Configuration Operation Q A...
Page 9: ...CONTENTS Introduction Preparation Installation Local GUI Configuration Operation Q A...
Page 12: ...Preparation Unbox Floor Stand Pole Package Pole and accessories...
Page 14: ...CONTENTS Introduction Preparation Installation Local GUI Configuration Operation Q A...
Page 18: ...CONTENTS Introduction Preparation Installation Local GUI Configuration Operation Q A...
Page 22: ...Configuration Device Upgrading Upgrading Terminal firmware Thermal camera Upgrading MCU...
Page 23: ...Configuration Temperature Settings...
Page 25: ...Configuration Mask Settings...
Page 27: ...Local Operation Log query...
Page 29: ...Local Operation Export records...
Page 31: ...A LITTLE BIT MORE...
Page 34: ...Thermal MinMoe iVMS 4200...
Page 35: ...Basic Settings Real time monitoring...
Page 39: ...Search and Export Events...
Page 42: ...Alarm handling on iVMS 4200...
Page 43: ...Operation iVMS 4200 Operation alarm linkage...
Page 44: ...Operation iVMS 4200 Operation alarm linkage...
Page 45: ...Operation iVMS 4200 Operation alarm linkage related email setting...
Page 46: ...Operation iVMS 4200 Operation alarm pop up with more details...
Page 48: ...Operation iVMS 4200 Operation quick alarm pop up...
Page 49: ...Others T A Records...
Page 50: ...Operation iVMS 4200 Operation T A Records Note T A rules need to be configured in advance...
Page 51: ...Thanks...