background image

USER / INSTALLER’S

MANUAL

MA-ES-RO-ZENIT_RO-0236-02_FL_20_V02

RESIDENTIAL  REVERSE OSMOSIS

Summary of Contents for ZENIT

Page 1: ...USER INSTALLER S MANUAL MA ES RO ZENIT_RO 0236 02_FL_20_V02 RESIDENTIAL REVERSE OSMOSIS ...

Page 2: ...robiologically safe or has an unknown quality For water with a greater salinity level please contact your official distributor It is advisable that the water to be treated has been softened or with a maximum hardness of 15ºF for optimum performance Water with a hardness greater than 15ºF will shorten the life of the membranes If the water has a high concentration of iron or magnesium nitrate conce...

Page 3: ...lear Do not bend the tubes to prevent flow and pressure blockages Use original spare parts to assure the correct performance of the system For installation maintenance and cartridge change please follow this manual otherwise the warranty will be void 3 CHECKING THE CONTENTS Open the packaging and make sure that all of the components are inside ready for the installation X 1 X 2 X 1 X 1 FIGURE 1 FI...

Page 4: ...e osmosis system b The water supply input is designed to be used with hoses with a connection Insert the water feed adapter with the brass ball valve between the cold water supply and the hose Never install on the hot water connection as the osmosis system will be damaged Make sure that the brass ball valve is closed a The drain clamp is designed to adjust the sealing drainpipe to 1 b The drain cl...

Page 5: ...stem Figure 13 where it is marked IN inserting it fully Once it is inserted replace the security clip e The WATER STOP Antileak system Figure 13 must be fixed to the base of the unit where you re installing the osmosis system fixing it with the adhesives sup plied f Once you have fixed the WATER STOP Antileak system in the chosen place you must connect the tube to the outlet of the Antileak system...

Page 6: ...erly and tightened and the ZENIT system is connected to the 220 240V power supply g Close the brass ball valve at the water inlet Figure 9 and reconnect the tube to the inlet elbow CTO cartridge insert it fully and replace the safety clip Open again the water supply opening the brass ball valve Figure 9 h Open the faucet and let the water run between 6 10 minutes to remove the chemical product tha...

Page 7: ...mosis system The recommended maintenance of the osmo sis system is in the table below By not following the maintenance as described in this manual using original cartridges and by authorized per sonnel that guarantees the quality of the water produced and the correct operation of the osmosis system the warranty will be void 6 USER INTERFACE The ZENIT osmosis system has a user interface system made...

Page 8: ...ferior to 1 000 ppm and the hardness is between 0 15ºF If the water supply s characteristics if applicable are different then the conditions regard ing the replacement of the membranes will change Replace the cartridges in the given period to ensure the life of the membranes and the quality of the water obtained a Close the ball valve of the feed adapter Figure 9 and unplug the system from the ele...

Page 9: ... O rings on the membrane Damaged membrane hou sing Replace the membrane housing Membranes damaged Replace the membranes Badly connected tubes Wire the connection between the wastage and the permeate properly 3 Bitter or acidic taste Water with very low salinity level Fit a mineralizing post filter j Once you have changed one of the cartridges turn off the faucet Figure 3 plug the system into the e...

Page 10: ...ck the mains water pressure if it is greater than 3 bars check the correct working of pressu re regulator if it is not so replace it Leak in some point of the system and or faucet Repair the leak and or replace faucet 9 The osmosis system stops and starts Very little inlet pressu re less than 1 bar Bypass the low pressure switch Danger that the pump could work without water and break Low pressure ...

Page 11: ... y CTO cart change Membrane change Postfilter change Sanitization Reparation Name and signature of the authorised technician or distributor DATE SERVICE MADE NEXT SERVICE OBSERVATIONS Sediments GAC y CTO cart change Membrane change Postfilter change Sanitization Reparation Name and signature of the authorised technician or distributor DATE SERVICE MADE NEXT SERVICE OBSERVATIONS Sediments GAC y CTO...

Page 12: ... 1 16 OI 0230 09 Feed adapter M x H x F 1 17 OI 0210 03 M x T Brass ball valve 1 18 OI 0207 45 2 simple clamp 2 19 TG A4TU4 Tee T x T x T quick connection 2 20 OI 0235 30 TDS Sensor 1 21 OI 0234 74 T 15A Maximum pressure switch 1 22 TG A6MC4 Male connector M x T 1 23 OI 0207 141 T 40 psi Pressure reductor 1 24 OI 0207 20 Drain clamp 1 25 OI 0207 139 WATER STOP Antileak system 1 26 TG A6TEU6 Stem E...

Page 13: ... 68 220 V 48 V Power supply 1 39 ME 2003 03 20x12 200GPD Membrane 2 40 TG A6BU6 T x T Bulkhead quick connection 2 41 TG A4BU4 T x T Bulkhead quick connection 1 42 TG A4ME4 Male Elbow M x T quick connection 2 43 OI 0205 18 2 x 10 Antibacterial Nanosilver in line post filter 1 44 OI 0207 116 Security clip 10 45 OI 0207 132 Security clip 24 46 OI 0207 133 Absorbent material for the Antileak system 2 ...

Page 14: ...26 27 MA ES RO ZENIT_RO 0236 02_FL_20_V02 MA ES RO ZENIT_RO 0236 02_FL_20_V02 NOTES NOTES ...

Page 15: ...0236 02_FL_20_V02 Hidro Water S L U Carretera Chirivella Aldaya 48 46960 Aldaya Valencia Spain Tel 34 961 98 62 30 hidrowater hidro water com www hidro water com DISTRIBUTOR INSTALLER Sale date Instalation date Stamp Stamp ...

Reviews: