5
hib.co.uk
Installation
1. Plan the position of the unit on the wall.
2. Mark the drill location onto the wall through the pre-drilled holes in the rear
cross rail of the unit.
See Fig. 1
.
3. Drill holes in wall and fix the unit into position with suitable fixings.
4. Silicone along the top edge of the unit and fit the basin
as per Fig. 2
. Silicone
along back edge of basin and along the back of the unit and wall
as per Fig. 3
.
Allow to set fully.
5. Fix tap in place, and finalise water and waste connections.
6. Secure handle in place using the pre-drilled holes in the door.