background image

Manufactured By

Module-RPM-E-Refrigerant-Module-Installation-052020

Module-RPM-E-Refrigerant-Module-Installation-052020

RPM-E Refrigerant Module

Installation Manual

Small Duct High Velocity Heating, Cooling and Home Comfort Systems

Summary of Contents for RPM-E

Page 1: ...y Module RPM E Refrigerant Module Installation 052020 Module RPM E Refrigerant Module Installation 052020 RPM E Refrigerant Module Installation Manual Small Duct High Velocity Heating Cooling and Home Comfort Systems ...

Page 2: ...g connections to the condenser lines quick and easy Fig RPM 01 RPM E Cooling Module Configurations When installing follow the recommendations shown in Table 01 demonstrated in Fig 01 For example a horizontal application could use A to B while highboy applications could use A to B1 Do not use a combination of A to A1 or B to B1 as this would bypass the cooling coil completely A1 is not to be used f...

Page 3: ...is is where the top most extent of the cooling coil is located See Specification Pages for the dimensions of the fan coil units and cooling modules Fig RPM 05 Secondary drain pan Capped Cleanout P Trap Secondary Drain Primary Drain Drain Connections P Trap Secondary Drain Pan The primary condensate drain must have a minimum 3 P Trap installed Fig 05 The drain line must run at a slope of per foot i...

Page 4: ...ure that the system will see Allow the system to hold the nitrogen charge for at least 15 minutes to ensure there are no leaks Check with local codes for proper testing procedures After the piping is installed and all components have been brazed together a vacuum pump must be used to evacuate the system from both the low and high side to 1500 microns 200 pa Add pressure to the system to bring the ...

Page 5: ...quid pressures while closing the valve will decrease suction pressures and raise liquid pressures Bi Flow Receiver The Bi Flow Receiver is designed for use with heat pump systems up to 5 tons and with any typical refrigerants The receiver allows refrigerant a location to migrate to during the heating cycle minimizing head pressures During cooling mode the receiver is empty allowing the full refrig...

Page 6: ...ure that the proper amount of airflow is provided to the coil Check for proper air flows and return air practices Improperly charged systems run the risk of short cycling as well An undercharged system will react much the same as a system with low airflow If the charge is low enough it may trip out on low pressure If a system is overcharged it may trip out on high head pressure Ensure that the sys...

Page 7: ...other products or materials furnished by the installer TERMS CONDITIONS Any repair performed under warranty must be approved by Energy Saving Products Ltd for this warranty to be valid This warranty replaces all other warranties expressed or implied www hi velocity com Should there be multiple consecutive failures of a single part warranty will not be considered unless a contractor has contacted E...

Page 8: ...b Energy Saving Products prides itself on Customer Service and provides design services and contractor support For all of your Heating Cooling and Indoor Air Quality needs the Hi Velocity System is the right choice for you Phone 780 453 2093 Fax 780 453 1932 Toll Free 1 888 652 2219 www hi velocity com Hi Velocity HE Z Fan Coils Hi Velocity HE Z Fan Coils Green Green Technology Technology Build Sm...

Reviews: