Hi-Force MHP100 Instruction Manual Download Page 2

 

INSTRUCTION MANUAL:  

Model Series:  MHP100 –MHP1000 inclusive 

Hi-Force Limited – Prospect Way – Daventry – Northants NN11 8PL – United Kingdom 
Tel: +44(0) 1327 301000:  Fax: +44(0) 1327 706555: Website: www.hi-force.com  

 

Major Pump Components 

 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The above diagrams show where all the major 
operating components of the MHP pumps are 
located. 

 
Operating Fluids: 
The MHP pump is designed to operate 
successfully with most hydraulic fluids, many 
lubricating oils and water. 
Some fluids may require specially fitted pump 
seals.  If in doubt please consult your Hi-Force 
Distributor. 
 
Preparation for Use: 
1. Fill the reservoir with the chosen fluid, leaving 
a small air space in the reservoir (1-2cm from 
the top of the fluid to the filler plug. 
2. MHP100 to MHP700 pumps the outlet port has 
a 3/8” NPT thread. MHP1000 pumps, the outlet 
port is 3/8” BSP.  Only hoses with a 4:1 safety 
rating on burst pressure may be used. 

Check hose for damage and connect it to the 
pump. Always apply good quality thread 

sealant or 11/2 turns of Teflon tape, taking care 
NOT to allow loose ends of the tape to enter 
the hydraulic system. Do not overtighten the 
connections – it can lead to premature failure 
or rupturing of fittings at below rated capacity. 
Your Hi-Force Distributor can supply you with 
the correct hoses for your pump. 
3. Fit the operating lever to the pump using the 
bolt and washer provided. The handle can be 
fitted in many positions at 45 degree intervals. 
Choose the most comfortable one for the 
operator. Ensure the handle can be operated 
through its entire travel range. 
** A small amount of free movement of the 
handle is normal and is due to the clearances 
in the manufacturing processes of the working 
parts of the pump. This free movement should 
not be confused with loss of effective stroke 
due to other causes.** 
4. Occasionally the rocker shaft will need 
greasing with a medium grade grease. This is 
done by removing the back plate. With the 
back plate off the rocker shaft can be 

removed and grease applied to all surfaces. 
 
Bleeding the System: 
1. Open the release valve on the pump by 
turning it anti-clockwise. Select low pressure by 
pulling out the High/Low Pressure Changeover 
switch. Now operate the pump through its 
entire stroke slowly and smoothly at least 10 
times. Stop pumping and push in the High/Low 
Pressure Changeover Switch to obtain high 
pressure. Again operate the pump through its 
entire range slowly and smoothly at least 10 
times. The pump should now be primed and 
ready to use. 
2. Close the Pressure Release Valve by turning 
clockwise using hand pressure ONLY. Do NOT 
over tighten! 
Select low pressure and operate the pump 
lever. When using the pump in a hydraulic 
circuit or for pressure tests it may be necessary 
to vent air from the circuit at the highest point 
in the system. When using the pump with a 

hydraulic cylinder, fully extend the cylinder, 
then invert the cylinder (plunger end down) 
and open the release valve on the pump to 
return any air in the system to the reservoir. 
Repeat bleeding operations if necessary. 
 
Operation: 
1. Start the pumping operation in low pressure 
to obtain rapid advance to load. When the 
operating effort reaches 52 Bars or the operator 
effort becomes excessive, select High Pressure 
by pushing in the pressure changeover button. 

Reviews: