FRU Replacement Guide
5 Storage Interconnect Replaceable Units
66
j.
(
For SW1 only
) And so on (refer to the Signal Cabling Scheme below).
Figure 38: Switch Port Reservations
Figure 39: Signal Cabling Scheme
8.
Reconnect the power cords to the new Storage Interconnect.
The Storage Interconnect begins to power up as soon as the power cables are connected.
9.
Reattach the two blanking plates onto the top front of the rack.