Chapter
11
11 Operating the 4U60 Storage Enclosure
The following chapter describes the operation of the 4U60 Storage Enclosure.
11.1
Before You Begin
Ensure that you have all of proper cabling to connect to the enclosure. The enclosure is designed to be installed
into a rack, not assembled on a bench top. Connect all of the cables, and turn on and boot the host or control
node server. Connect the power to the 4U60 Storage Enclosure; it will come on and boot without any interaction
from the user.
11.2
Power On/Off
The 4U60 Storage Enclosure does not have an external power switch, the enclosure is powered on by plugging
power cords into the power supplies. Once powered on, the enclosure automatically powers up all drives.
11.3
Verifying the Drives
To verify the drives, do the following:
1. Using SG Utilities, type the following command Sg_scan –a -s -v.
A list of device SCSI results appear.
2. Press Enter.
39
11
Operating the 4U60 Storage Enclosure
User Guide
11.1
Before You Begin