15. Connect the optical drive power-SATA cable to the system board.
16. If the fan cage was removed, do the following:
a. Make sure that all the system cables that are routed through the front cable channel are properly secured in the
metal cable tabs. This is done to prevent system damage due to cables being inadvertently caught under the fan
cage.
19. Do one of the following:
Position the tower server for operation.
• Server in rack mode:
Slide the server into the rack.
20. Connect all peripheral cables to the server.
21. Connect each power cord to the server.
22. Connect each power cord to the power source.
The installation is complete.
Fan cage option
The server supports a fan cage option. This fan cage is required for
specific hardware configurations.
Kit contents
• Fan cage with four preinstalled fans
• Fan cage brackets (2)
Fan cage implementation
The fan cage is required to meet the system thermal requirements for the following configurations:
• Server operating in rack mode
• Dual-processor configuration
• Server with the following drive box configurations:
◦
The maximum number of drives is installed in boxes 1, 2, and 3 (12 drives for LFF configuration, 24 drives for SFF
configuration).
◦
The maximum number of drives is installed in boxes 2 and 3, and at least two media devices are installed.
• Server with the following options installed:
Hardware options installation
115
Summary of Contents for ProLiant ML350 Gen10
Page 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Page 31: ...Component identification 31 ...
Page 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Page 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...