HermanMiller Prospect Media Space Installation And Disassembly Download Page 1

Parts Included

Tools Required

HermanMiller

Prospect

 Media Space Installation and 

Disassembly for Recycling Instructions

How to assemble your Prospect Media 
Space.

Power Driver

Foot Assembly

Toe Rail

LH Ledge

RH Ledge

Side Panel

RH End Rail

Mid Rail

LH End Rail

LH Toe Rail end Cap

Bottom Panel Clip

Top Panel Clip

RH Toe Rail End Cap

Glide

Step 1

Step 2

Phillips Bit

Allen Wrench

Level

Safety Glass

1.1 Assemble Glides Fully into Foot Assemblies.

Toe Rail Mounting 

Bracket

RH Toe Rail Endcap

LH Toe Rail Endcap

Long Side

Long Side

M8 x 16 Flathead 

Hex Socket Screws

Hex Socket Button 

Head Screws

Hex Socket Button 

Head Screws

Glide

Foot Assembly

2.1 Assemble Toe Rail Mounting Brackets to inner Foot Assemblies with M8 x 
16 Flathead Hex Socket Screws.

2.2 Attach Toe Rail Endcaps to outer Foot Assemblies with Hex Socket Button 
Head Screws.  Note: Endcaps are Right and Left  Handed.

Wire Trough

Peninsula Surface

Connector Plate

Toe Rail Mounting 

Bracket

M8 x 25 Flat Head 

Socket Screw

M8 x 16 Flat Head 

Socket Screw

M8 x 20 Flat Head 

Socket Screw

M5 x 12 Flathead 

Socket Screw

Hex Socket Button 

Head Screw

Hex Socket Button 

Head Screw

Phillips Button 

Head WoodScrew

M5 x 25 Hex Socket 

Head Cap Screw

Spider

Foot

Column

Bag Hook

Table Clamp

Cup

HermanMiller

Assembly Instructions

1

1BJZTY rev B

Summary of Contents for Prospect Media Space

Page 1: ...ad Hex Socket Screws Hex Socket Button Head Screws Hex Socket Button Head Screws Glide Foot Assembly 2 1 Assemble Toe Rail Mounting Brackets to inner Foot Assemblies with M8 x 16 Flathead Hex Socket Screws 2 2 Attach Toe Rail Endcaps to outer Foot Assemblies with Hex Socket Button Head Screws Note Endcaps are Right and Left Handed Wire Trough Peninsula Surface Connector Plate Toe Rail Mounting Bra...

Page 2: ...e been started Make sure all Toe Rails are pushed tight together with no gaps before tightening Bag Hook Bag Hook Toe Rail Toe Rail Toe Rail Bag Hook M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flat...

Page 3: ...head screw 7 2 Position Foot onto column 7 3 Capture foot inside of column with Table Clamp 7 4 Secure clamp with M8 x 24 Flathead socket screw 7 5 Repeat process for other 3 feet 8 1 Attach Peninsula Leg Assembly to surface assembly with M5 x 25 hex socket head cap screws M8 x 24 Flathead Hex Socket Screws Hex Socket Button Head Screws Foot Table Clamp Peninsula Assembly Cove Leg Assembly Spider ...

Page 4: ... of rails should always be at bottom There are right and left hand end rails Grooves must face inward toward toe rail Inside Rail Inside Rail RH End Rail LH End Rail Side Panel Step 12 12 1 Peel protective film from side panels Long sweeping pull helps remove faster Be sure to hold panel firmly pushing down into carpet while a partner pulls 12 2 Assemble Bottom Panel Clips to inside surface of eac...

Page 5: ...nel clips are positioned into slots in bottom of rails May need to push in on panel from outside to keep clips fully engaged inside of grooves 14 1 Turn glides as needed to make wall assembly level 14 2 Turn glides on peninsula leg to make peninsula surface level Grooves Side Panel Glide Glide Glide Glide Glide Side Panel Side Panel Slot Rail Bottom Panel Clip Step 15 15 1 Insert flange on Cup int...

Page 6: ...nents are marked with ASTM recycling codes Use these codes to identify material type for recycling Non marked components should be treated as mixed plastic Ferrous metals can be identified using a small magnet for recycling Non ferrous metals should be separated and recycled separately To disassemble product reverse the above installation steps ...

Reviews: