OWNER/OPERATOR RESPONSIBILITY
It is the responsibility of the owner/operator to properly use and maintain this equipment.
The instructions and warnings contained in this manual shall be read and understood by the owner/operator prior
to operating this equipment.
If an owner/operator does not understand English, the contents of this manual shall be explained in the owner/
operator native language to assure the owner/operator comprehends.
It is the responsibility of the owner/operator to maintain the legibility of all warning and Instruction labels.
The owner/operator shall retain this manual for future reference to Important warnings, operating and maintenance
instructions.
INSTALLATION
Installation consists of anchoring the unit
to the floor, connecting an external air
supply with 100 to 120 p.s.i., routing the
liquid waste drain to a suitable liquid waste
reservoir and connecting a 2" id exhaust
hose to the fume extractor.
DO NOT attempt to operate the unit while
on a skid. The initial crush of the can
will cause the unit to move or jump if not
secured properly. The crusher must be
anchored to the floor before operating.
The unit is equipped with a 125 p.s.i. relief
valve that will bleed off air if the unit is
inadvertently connected to an air source
greater than 125 p.s.i.
See Figure (1). Install the crusher as follows.
A. Anchor the unit to the floor using
1/2" diameter hardware.
B. Connect the supplied pressure
regulator/filter to the crusher 3/8"
NPT air inlet fitting.
C. Connect the external air supply to
the pressure regulator/filter.
D. Connect the liquid waste drain line to
the crushers 1-1/2' NPT liquid waste
drain fitting.
E. Connect 2" ID exhaust hose to fume
extractor located on the back of the
Figure 1
1/2" Floor anchor
Filter/Regulator
Liquid waste
drain fitting
3/8 NPT Air Inlet
Fume extractor
Page 5 of 8