There are two ways of installing the bar capping
.
Option 1
: Cut the capping above and below the louvre.
Option 2
: Insert a full length of bar capping. You have to push the bottom
edge in first between the louvre and the glazing bar. Once in position,
push the top edge under the arrow head of the glazing bar.
Summary of Contents for HE-HAS LEAN-TO
Page 7: ...916 916 916 304 304 916 Internal View 300 304 ...
Page 9: ...918 927 333 915 309 309 309 920 915 927 333 300 920 921 ...
Page 11: ...918 927 915 314 314 314 915 927 333 333 300 920 920 921 ...
Page 13: ...915 927 333 314 915 314 915 ...
Page 15: ...600 Internal View 921 600 924 924 ...
Page 17: ...918 572 572 ...
Page 19: ...918 927 7mm 918 7mm Drill 5mm weep holes every 300mm in the gutter ...
Page 22: ...Internal View Internal View Internal View Louvre B 610 x 457 Louvre Frame ...
Page 26: ...Door Assembly 377 373 558 583 Internal View 379 Internal View Top ...
Page 27: ...583 708 707 377 379 583 384 379 External View Internal View Internal View ...
Page 32: ...XL Autovent Attachment to Hercules Greenhouses 709 543 541 927 924 540 541 924 Internal View ...