Cut all the bar capping to length
. Start with the longest length of bar capping and work your way
round the greenhouse until you get to the smallest piece.
A hacksaw is the ideal tool for the job.
(To make it easier, try grouping capping of the same length when cutting.)
Once you have cut all the capping distribute it around the greenhouse. So when
you start glazing, the capping you need is always to hand.
Section View
Part Size
(mm) 86
88
810
812
A
610 X 610
1
1
2
2
B
610 X 457
9
10
11
12
E
610 X 1972
3
4
5
6
L
573 X 100
10
10
10
10
Q
610 X 1520
7
8
9
10
W
610 X 1070
2
2
2
2
II
610 X 151 X 10
2
JJ
610 X 292 X 150
2
KK
610 X 436 X 294
2
LL
610 X 582 X 441
2
610
13
14
15
16
557
590
2
DD
563 X 880
4
F
610 x 625
2
3
3
4
Summary of Contents for Bosworth LEAN-TO
Page 7: ...916 916 916 304 304 916 Internal View 300 304 ...
Page 9: ...918 927 915 309 309 920 309 918 927 922 927 927 309 922 ...
Page 10: ...334 309 915 334 300 309 915 920 918 334 ...
Page 12: ...919 928 915 318 318 920 919 928 921 928 928 318 921 928 ...
Page 13: ...334 318 915 334 300 915 920 919 334 921 334 920 318 ...
Page 15: ...915 928 334 314 915 314 915 ...
Page 17: ...Internal View 925 External View 925 916 944 944 588 588 ...
Page 18: ...599 599 925 916 944 588 300 684 685 ...
Page 21: ...919 928 7mm 919 7mm Drill 5mm weep holes every 300mm in the gutter ...
Page 24: ...Internal View Internal View Internal View Louvre B 610 x 457 Louvre Frame ...
Page 39: ......