background image

55

uGate21

H

G

J

K

SH

EE

T:

2 /3 

HERAS

uG

ATE

 SL

ID

IN

G GATE

uGa

te 

m

ttb

 D

e

DE

S

IG

NE

D B

Y

FOU

ND

ATION

 / BUIL

T U

P

 / 

BAS

IC 

DIM

EN

SION

S

 

DO

UB

LE

EF

15-

8-2014

 

DA

TE:

 

H

G

J

K

hekwer

klijn/

 Zau

nflu

cht

/fen

ce 

line

align

ement

 c

lôt

ure/

 stak

et

linje

 

hek

w

erk

lijn/ 

Zaunfluc

ht/fenc

line/ 

aligne

m

ent

 clôt

ure/ 

st

ak

et

lin

je

132

Her

as fe

nc

e po

st

4x ø12x1

00 

M

10x130

90

150

4x ø12

x100 

M10x1

30

13

2

H

eras

 fe

nc

e po

st

D

e

37

15

B

 []

2478

2

Ad

e

 []

371

5

B

 []

45

45

196

334

-1

3 +

196

100

700

21

0

20

150

196

334

-1

3 +

196

100

150

700

21

0

20

90

334

-1

3 +

196

ge

bru

ik

 bo

or

mal

us

e dr

ill t

empl

ate

bi

tte

 Boh

rschabl

one

 nu

tze

n

ut

ilis

er

 le

 ga

bar

it d

e p

erçage 

ta

 bo

rrm

al

anv

än

d b

or

rm

al

l

   

410

527

410

527

8x ø18

x130 

M16x2

00

4x ø14x1

00 

M

12x160

 

8x

 ø

18x13

M16

x200

 

8x ø

18x

130 

M16x2

00

8x

 ø

18x13

M16x

200

4x ø14x100 

M12x16

0

 

8x ø18x150 

M16x20

0

232

90

(25

5)

150

123

196

100

232

400

250

=

=

196

334

-1

3 +

100

196

123

(25

5)

90

232

Summary of Contents for uGate21

Page 1: ...UGT ALL JUN21 uGate21 Montagehandleiding NL Installation manual EN Installations Handbuch DE Manuel d installation FR Installationsanvisningar SV Monteringsvejledning DA...

Page 2: ...het verplaatsen van zware en of grote objecten Gebruik altijd passend gereedschap Geen onderdelen toevoegen of verwijderen anders dan beschreven in deze handleiding om negatieve gevolgen voor de veil...

Page 3: ...onderdelen waterpas zijn Graaf een gat Voer de werkzaamheden niet alleen uit Gebruik een tilhulp hijsinstallatie Gebruik beton Volg de instructies op de verpakking Gebruik injectie mortel Volg de ins...

Page 4: ...when moving heavy and or large objects Always use suitable tools Do not add or remove parts other than as described in this manual to avoid negative consequences on the safe operation of the nal prod...

Page 5: ...parts are level Dig a hole Do not perform the work on your own Use a lifting tool hoisting system Use concrete Follow the instructions on the packaging Use epoxy Follow the instructions on the packag...

Page 6: ...t nden immer entsprechendes Hebezeug Verwenden Sie immer angemessenes Werkzeug Keine andere Teile hinzuf gen oder entfernen abgesehen von den in dieser Anleitung beschriebenen F llen um negative Auswi...

Page 7: ...ss die angegebenen Teilen waagerecht sind Ein Loch graben Die Arbeiten nicht allein ausf hren Ein Hebezeug verwenden Beton verwenden Befolgen Sie die Anweisungen auf der Verpackung Einpressm rtel verw...

Page 8: ...placer des objets lourds et ou volumineux Utiliser toujours un outillage ad quat Ne pas ajouter ou retirer des pi ces autres que celles d crites dans ce manuel pour viter des cons quences n gatives s...

Page 9: ...s travaux seul Utiliser un accessoire de levage appareil de relevage Utiliser du b ton Suivre les instructions mentionn es sur l emballage Utiliser du coulis Suivre les instructions mentionn es sur l...

Page 10: ...ing n r du yttar tunga eller stora f rem l Anv nd alltid l mpliga verktyg L gg till eller ta bort delar annat n som beskrivs i denna handbok f r att undvika negativa konsekvenser f r slutproduktens dr...

Page 11: ...t p egen hand Anv nd ett lyftverktyg eller en lyftanordning Anv nd betong F lj instruktionerna p f rpackningen Anv nda epoxi F lj instruktionerna p f rpackningen Kontrollera avst ndet C u Anv nd en m...

Page 12: ...ystem n r der yttes tunge og eller store genstande Ikke tilf j eller fjern dele andet end beskrevet i denne vejledning for at undg negative konsekvenser for sikker drift af slutproduktet FARE Arbejde...

Page 13: ...e niveauer er vandret Grav et hul Udf r ikke selv arbejdet Brug l ftev rkt j hejsesystem Brug cement F lg vejledningerne p emballagen Brug epoxy F lg vejledningerne p emballagen Kontroller afstanden C...

Page 14: ...14 uGate21 1 5 0 19 24 Safety Distances EN 12453 2017 A1 2021 Sd A 18 5 18 5 29 29 44 44 100 120 300 500 850 Sd A 39 42 45 48 51 54 min 2x 1 2 3 5 4 6...

Page 15: ...15 uGate21 1 2 3 A B 7m 8m 9m 10m 11m 12m 2 2 2 3 3 3 1 2 1 2 1 2 1 2 3 1 2 3 1 2 3 Nr 2x 19 A B 2 8x 4x 7 8 9 10 7m 8m 9m 10m 11m 12m 1x 1x 1x 2x 2x 2x 3x 3x 3x 4x 4x 4x 5 Nm 17 11 12...

Page 16: ...16 uGate21 A 1 2 0 5 1mm 160 170 Nm 2 1 A B 3 A B 13 15 14 16 A B 17 18...

Page 17: ...17 uGate21 A 2 1 17 m 5 30 B A 1 2 19 21 20 22 SN_tensioning_uGATE pdf B STOP 23 24...

Page 18: ...18 uGate21 5 A 30 min 400 mm 1 B max 3 mm 3 1 2 A B 24 26 25 27 31 47 31 47 28 30...

Page 19: ...19 uGate21 A 12T 12T 12T 12 T min 400 mm 29 30 A min 15 mm 3 1 2 2x A 1 31 32 33...

Page 20: ...20 uGate21 30 4 A 34 35 2 5 36 38 1X 1X 37...

Page 21: ...21 uGate21 85 B 5 1 2 3 A 39 40 2 5 4 1 2 4 3 5 6 41...

Page 22: ...22 uGate21 42 1500 1500 4 4 CU CU 5cm 1 2 3 4 44 44 45 A 46...

Page 23: ...23 uGate21 A 5 M6 5 M6 50 1x 2x 50 53 50 53 48 A 49 1 2 2 3 1 47 A 4 8 9 Nm 51...

Page 24: ...24 uGate21 B 1 1 2 2 0 55 59 59 A 47 52 53 54 56 55 57...

Page 25: ...25 uGate21 4 6 5 3 1 2 5 M6 5 M6 5 M6 5 M6 4 8 9 Nm 4 8 9 Nm 58 59 60 62 61 63...

Page 26: ...26 uGate21 1 3 1 2 2x 65 66 6 3 1 2 max 20 25 Nm 4 5 mm 150 140 64 1 72 70 A B 67...

Page 27: ...27 uGate21 70 72 A B 17 70 75 0 5 69 70 73 1 71 A B 68...

Page 28: ...28 uGate21 1 2 max 3 2x A 30 1 4 1 2 3 3 1 2 2x 70 1 1 A 1 2 3 8 72 73 74 76 75 77...

Page 29: ...29 uGate21 102 79 35 19 54 B B 136 HGD 78 79 80 81 82...

Page 30: ...30 uGate21 1 2 30 84 5 10mm 6 83 85 87 86 90...

Page 31: ...31 uGate21 91 92 C O 88 22 40 120 89 90...

Page 32: ...32 uGate21 1335 1635 1835 2135 2335 3x 4x 4x 5x 5x A N A N M6x60 5 TT25 140 150 97 6 24 35 93 6 30 10 15 mm 95 19 1 mm 94 96...

Page 33: ...33 uGate21 400 CLOSE OPEN ISK 1500 101 99 104 100 SKL CLOSE SKL OPEN HGD 98...

Page 34: ...34 uGate21 19 min 600 max 40 3x 106 109 99 24 35 19 1 mm 102 103 6 30 10 15 mm 106 106 107 104 105...

Page 35: ...35 uGate21 5 2 max 5 7 29 80 10 5 7 17 6 3 6 111 112 108 109 110 107...

Page 36: ...36 uGate21 117 8 5 8 5 10 80 130 22 8 8 13 6 117 118 115 114 116 113...

Page 37: ...37 uGate21 24 41 5 6 DS25 6 3 6 122 123 124 120 119 121...

Page 38: ...38 uGate21 A B 22 65 44 max 320 2 22 B 22 65 44 max 520 2 22 A A A IR 2x A Transmitter Receiver B A A 126 125 127 127 128 128...

Page 39: ...11932 Afm maaiveld Gel ndeh he ground level niveau du Sol Markniv FUNDATIE FOUNDATION FUNDAMENT FONDATION NL Beton C20 25 Afwijkingen in uitvoering zonder toestemming van Heras is niet toegestaan DE...

Page 40: ...e staketlinje hekwerklijn Zaunflucht fence line alignement cl ture staketlinje Lm 3715 B 12377 Am gebruik boormal use drill template bitte Bohrschablone nutzen utiliser le gabarit de per age ta borrma...

Page 41: ...m 5400 L1 5400 L2 5400 L3 16200 L 12079 Dm 200 N 133 Tm DOORGANG OPENING DURCHGANG PASSAGE PPNING 112 35 max 55 35 max 55 Lm 92 Mm 28775 Ummax 63 Wm 28475 Um 210 V 125 X NL 55 niet toegestaan Tenzij a...

Page 42: ...chziehen der Kabel durch die PVC Rohre bauseits vorab einlegen Arbeitsraum im Bereich der PVC Rohre erst nach Einzug der Elektrokabel auff llen Abweichende Ausf hrungen nur nach R cksprache mit HERAS...

Page 43: ...ijn Zaunflucht fence line alignement cl ture staketlinje 196 100 90 150 Le 334 1 3 196 700 3715 B 12273 Ae gebruik boormal use drill template bitte Bohrschablone nutzen utiliser le gabarit de per age...

Page 44: ...00 L2 5400 L3 16200 L 11805 De 28598 Ue 200 N 143 Te 85 DOORGANG OPENING DURCHGANG PASSAGE PPNING 112 35 max 55 35 max 55 Le 13 Me 200 IR max 28670 Uemax 148 We 125 V 125 Qe NL 55 niet toegestaan Tenz...

Page 45: ...ol Markniv FUNDATIE FOUNDATION FUNDAMENT FONDATION wapening Armierung reinforcement ferraillage Armering 100x100 150x150 Rm BUITENZIJDE OUTSIDE AUSSEN EXT RIEUR UTANF R 410 170 12079 Dm 3 3 4105 Bf 11...

Page 46: ...e staketlinje hekwerklijn Zaunflucht fence line alignement cl ture staketlinje Rm 12377 Am 3715 B gebruik boormal use drill template bitte Bohrschablone nutzen utiliser le gabarit de per age ta borrma...

Page 47: ...m 5400 L1 5400 L2 5400 L3 16200 L 28475 Um DOORGANG OPENING DURCHGANG PASSAGE PPNING Rm 12079 Dm 92 Mm 28775 Ummax 63 Wm 210 V 35 max 55 35 max 55 133 Tm 200 N 112 NL 55 niet toegestaan Tenzij ankerst...

Page 48: ...level niveau du Sol Markniv 125 V 3 3 148 We 3 3 728 600 600 225 166 250 200 198 75 530 198 200 625 198 max 40 NL Beton C20 25 Trekdraad vooraf in PVC buis leggen en grond aanvullen na leggen kabel Af...

Page 49: ...nflucht fence line alignement cl ture staketlinje Re 3715 B 12273 Ae gebruik boormal use drill template bitte Bohrschablone nutzen utiliser le gabarit de per age ta borrmal anv nd borrmall 410 280 4x...

Page 50: ...00 L3 16200 L DOORGANG OPENING DURCHGANG PASSAGE PPNING Re NL 55 niet toegestaan Tenzij ankerstangen in overeenstemming zijn verlengd om verankeringsdiepte te waarborgen en constructieve beton is aang...

Page 51: ...klijn Zaunflucht fence line alignement cl ture staketlinje 1070 1070 4105 Bf 4105 Bf 10 maaiveld Gel ndeh he ground level niveau du Sol Markniv Dm BUITENZIJDE OUTSIDE AUSSEN EXT RIEUR UTANF R 40 40 80...

Page 52: ...staketlinje 132 Heras fence post 4x 12x100 M10x130 90 150 4x 12x100 M10x130 132 Heras fence post Dm 3715 B 24712 Adm 3715 B 45 45 196 334 1 3 196 100 150 196 334 1 3 196 100 90 334 1 3 196 gebruik boo...

Page 53: ...B 24712 Adm 3715 B 12307 R 200 N 58 Tdm 112 16200 Ll 16200 Lr 142 Mdm 35 max 55 35 max 55 Dm 410 125 X 200 IR max 63 Wm NL 55 niet toegestaan Tenzij ankerstangen in overeenstemming zijn verlengd om ve...

Page 54: ...600 200 75 200 75 600 600 500 410 527 410 527 800 530 198 200 530 198 200 NL Beton C20 25 Trekdraad vooraf in PVC buis leggen en grond aanvullen na leggen kabel Afwijkingen in uitvoering zonder toeste...

Page 55: ...0 M10x130 90 150 4x 12x100 M10x130 132 Heras fence post De 3715 B 24782 Ade 3715 B 45 45 196 334 1 3 196 100 700 210 20 150 196 334 1 3 196 100 150 700 210 20 90 334 1 3 196 gebruik boormal use drill...

Page 56: ...24782 Ade 3715 B 12307 R 57068 Ude 24096 Dde 200 N 143 Te 85 112 16200 Ll 16200 Lr 212 Mde 35 max 55 35 max 55 De 410 125 X 200 IR max 148 We NL 55 niet toegestaan Tenzij ankerstangen in overeenstemmi...

Page 57: ...57 uGate21 120 25 119 26 uGate SN_tensioning_uGATE pdf STOP 1 B A 6m B A B A 2 4 3...

Page 58: ...Heras B V Hekdam 1 P O box 30 5688 ZG Oirschot Tel 31 499 55 12 55 E mail infoNL heras nl Local supplier stamp...

Reviews: