51
T51002 E
InstallatIon, servIce and troubleshootIng Procedures
CHECKING PRO COlD TARGET PRESSURES
Follow this procedure to check cold target pressures
(Figure 52) for TIREMAAX PRO systems.
IMPORTANT:
The TIREMAAX PRO target gauge
(Figure 53) is required for this
procedure. The PRO regulator does not
self exhaust which could result in false
readings.
Available clean, dry
shop air supply
must be at least 15 psi above cold
target (inflation) pressure for this
test.
1.
Chock
wheels or otherwise
immobilize trailer
.
2.
locate
controller on the trailer.
Ensure
supply
valve is in closed position. Refer to Figure 49 on
3.
Open
controller cover,
remove
test port vent, if
included, and
connect
target gauge (Figure 53) to
IMPORTANT:
Ensure target gauge shop supply
valve is closed and the pressure relief
button is not pressed while installing or
removing target gauge.
4.
Charge
tank by connecting clean, dry
shop air
supply
to emergency brake and target gauge.
Once charged, disconnect
from emergency brake
5.
Check
PRO INFLATION Pressure.
A.
Ensure
target gauge shop supply valve is
closed.
B.
Open
controller supply valve on the supply
line.
C.
Press and release
the pressure relief button.
D.
Read and record
target gauge pressure.
NOTE:
Delivery inflation pressure
should be at
the specified cold target pressure
on the
controller decal (Figure 44 on page 36).
6.
Check
PRO DEFLATION Pressure.
A.
Close
the controller supply valve.
B.
Open
the shop supply valve. You should hear
air exiting the valve.
C.
Close
the shop supply valve. Air should stop
exiting after 45 to 60 seconds.
D.
Read
and record
the target gauge pressure.
This is the current Deflation Pressure.
7.
Compare
measured INFLATION and DEFLATION
pressure readings to desired settings.
NOTE:
Delivery deflation pressure should be
10 psi higher than the specified cold target
pressure on the controller decal (Figure 44 on
A.
If
not at specified cold target pressure
settings, refer to TROUBLESHOOTING on
B.
If
adjusting target pressures, proceed to
ADJUSTING PRO COLD TARGET PRESSURES.
8.
Close
controller supply valve on the supply line.
9.
Disconnect
shop air supply at target gauge.
10.
Disconnect
target gauge from controller test port.
11.
Reinstall
text port vent, if included, in store
position.
12.
Close
controller cover and
open
controller supply
valve to restore system to normal operation.
ADJUSTING PRO COlD TARGET PRESSURES
Two target pressures, inflation and deflation, are set
for TIREMAAX PRO systems.
Deflation must be set
10 psi above inflation pressure.
Before making adjustments, perform
COLD TARGET PRESSURES on page 51 to Step 4.
NOTE:
To properly perform this procedure, there must
be sufficient air pressure in the trailer air tank
and the emergency brakes must be set.
If increasing
DEFLATION PRESSURE, then ADJUST PRO INFLATION
If decreasing
target pressures, ADJUST PRO
INFLATION PRESSURE, then ADJUST PRO DEFLATION
Adjust PRO INflATION Pressure
Use this procedure to adjust inflation delivery pressure
for TIREMAAX PRO controller.