background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

80/3 Door Overview 

80/3Track components 

APP = (3xDW) – (3xOL) 

PCH RECOMMEND OL = 70mm 

APP =  3 x DW – 210 

Or 

DW = APP + 210 

                

Doors open 
final position 

KEY 

DW = DOOR WIDTH 

 

 

 

 

APP= MAXIMUM RECOMMENDED CLEAR OPENING WIDTH 

OL = OVERLAP OF DOORS (RECOMMENDED 70mm) 

 

 

Summary of Contents for 80/2

Page 1: ...rm Fixed Floor guide Adjustable floor guide bracket Adjustable floor guide foot 80 2 x 1 x 1 x 1 x 1 80 3 x 2 x 1 x 2 x 2 Datum Block Spanner Husky Hanger Apron plate Second door bracket 80 2 x 1 x 1...

Page 2: ...n keys Posi drive screwdriver Spirit level Tools required Scissors System overview track installation KEY DT DOOR THICKNESS TSH TRACK SET HEIGHT DH DOOR HEIGHT S GAP REQUIRED BETWEEN TRACKS X PCH RECO...

Page 3: ...Door Overview DT 10 2 80 2Track components KEY DW DOOR WIDTH APP MAXIMUM RECOMMENDED CLEAR OPENING WIDTH OL OVERLAP OF DOORS RECOMMENDED 70mm Doors open final position APP 2 X DW 2 X OL PCH RECOMMEND...

Page 4: ...ew 80 3Track components APP 3xDW 3xOL PCH RECOMMEND OL 70mm APP 3 x DW 210 Or DW APP 210 Doors open final position 3 KEY DW DOOR WIDTH APP MAXIMUM RECOMMENDED CLEAR OPENING WIDTH OL OVERLAP OF DOORS R...

Page 5: ...1 Attach apron plates All doors 2 Attach long arm on follower door Atta DT 20 2 DT 20 2 8G x 38 Wood Screws 4 5 x 30 Wood Screws...

Page 6: ...3 Attach short arm on follower doors 4 Remove bearing caps DT DT 20 2 4 5 x 30 Wood Screws...

Page 7: ...5 Loop belt around bearing wheels cut belt to length Loop belt around bearing wheels 6 Attach both ends to belt joint bracket M6 x 12 CSK HD HD Belt clamp...

Page 8: ...RTANT Belt tension should be sufficient to allow connection between doors 7 Clamp bracket should be free to traverse between bearings 8 Re attach bearing caps Approx 10 22mm depending upon door thickn...

Page 9: ...9 Position retain block on Lead door Lead door Follower door Fixed floor guide Adjustable floor guide 10 Floor guide overview 4 5 x 30 Wood Screws DT 20 2...

Page 10: ...12 Position floor guide on follower door 11 Align doors with spirit level to position fixed floor guide 4 5 x 30Wood screws DT 10 2 3 Datum Wall Spirit level M4 x 6 Grub screw...

Page 11: ...13 Hang doors onto husky hangers 14 Set height secure doors to hangers See system overview for set height...

Page 12: ...15 Ensure floor guide correctly aligned 16 Connect doors Tighten...

Page 13: ...17 80 2 80 3 DOOR BELT OVERVIEW 18 80 3 DOOR SYSTEM ONLY Add second door bracket to long arm M6 X 12 CSK HD Second door clamp bracket...

Page 14: ...ORS 20 80 3 door belt connection overview M6 x 12 CSK HD Clamp block Follower door 1 Follower door 2 Follower door 2 Follower door 1 Belt runs in front of belt bracket Bracket to be clamped to door Be...

Page 15: ...the track 4 5x30 Wood Screws 4 5x30 Wood Screws Soffit fix Face fix Mark position of datum block by aligning with edge of Follower door 21 With doors in fully closed position mark position for datum b...

Page 16: ...ly closed position locate the clip stop by sliding the stop up to the lead door hangers and securing in position 25 With all doors aligned in the open position locate the clip stop by sliding the stop...

Reviews: