Crescent V100 Series User Guide
13
Figure 1-7. Running cable through fixed base
2. Align the connector keyway of the cable to the key of the
connector mounted on the Crescent V100 enclosure. (See
Figure 1-8.)
3. Insert the cable mount connector into the bulkhead connector,
aligning the locking ring at the same time. (See Figure 1-8.)
Figure 1-8. Power/Data cable and keyway
Connector
Keypad
Connector
Key
Summary of Contents for Crescent V100 Series
Page 1: ...Crescent V100 Series User Guide Part No 875 0174 000 Rev A1 ...
Page 3: ......
Page 27: ...20 1 Installation Figure 1 15 Running cable through the pole base ...
Page 50: ...2 CRESCENT V100 OPERATION GPS Overview Understanding the Crescent V100 ...
Page 67: ......
Page 68: ...APPENDIX A TROUBLESHOOTING ...
Page 73: ......
Page 74: ...APPENDIX B SPECIFICATIONS ...
Page 79: ......
Page 80: ...APPENDIX C PARTS LIST ...
Page 83: ......
Page 85: ......
Page 86: ...www hemispheregps com e mail info hemispheregps com ...