![Helo ROCHER DET Installation And User Manual Download Page 10](http://html1.mh-extra.com/html/helo/rocher-det/rocher-det_installation-and-user-manual_2122376010.webp)
2.13.
Locating the connecting box for the connection cable in the sauna room
200
m
m
A A
500
m
m
3.
2.
500
m
m
1
3.
2.
Image 4
Location for the connection box
100 mm = Specified minimum safety clearance
1. Recommended location for the connecting box
2. Silumin box recommended in this area.
3. This area should be avoided. Always use a silumin box.
In other areas, use a heat-resisting box (T 125 °C) and heat-resisting cables (T 170 °C). The
connection box must be clear of obstacles. When installing the connection box to zones 2 or 3,
refer to the instructions and regulations of the local energy supplier.
Installation and User Manual ROCHER DET
10