Helo 1118-60-0405 Installation And User Instructions Manual Download Page 9

 
 
 
Install the round-edged stone next. Push the other end 
under the edge and then push the stone along the 
support plate against the end limiter. 
 
 
 
 
 
 
 
In the illustration the round edge stone and the 
soapstone furthest at the back remain where they are. 
 
 
 
 
 
 
The illustration shows both the vertical and horizontal 
limiters of the soapstones. 
 
 
 
 
 
 
Install the middle stones. The length of the middle 
stones is 405mm. Push the stone first under the right 
edge and then along the support plate under the left 
edge against the end plate. 
 
 
 
 
 
 
Finally check that the soapstones are between the end 
limiters and that the gaps between the stones are 
equal. 

 
 

 

9

Summary of Contents for 1118-60-0405

Page 1: ...crumble because otherwise the air circulation through the stones is affected When replacing the stones new stones have to be of a high quality NOTE The heater stones MUST NOT be placed in the space b...

Page 2: ...locking pieces for the heater A 2 pieces wall fastener B 1 piece metal screw 4 2 x 13mm 2 pieces cover screw 6 x 40mm 2 pieces Fit the locking pieces A for the heater into the holes in the back plate...

Page 3: ...ot crack even at high temperatures 1 The first heating Set the heater to approx a 50 C setting for about an hour Then disconnect the heater and let the stones cool down 2 The second heating Set the he...

Page 4: ...ple through the wall the entry valve is placed in area B and the exit valve at least 1m higher and as far as possible from the heater Due to the sensor element OLET 19 location placing of the entry va...

Page 5: ...aunabeleuchtung Sauna light max 100W 3 Tuuletin Fl kt Ventilator Fan max 100W 4 S hk l mmityksen vuorottelu El f rregling av annan el f rbrukare Signal kontakt Signal contact 5 Ohjauskeskus Styrpanel...

Page 6: ...II 2002 Sensor Input 400V 3N Heater Principal wiring diagram N N 55 Sauna light 230V 100W Fan 230V 100W Electrical heating Control 230V NOTE Not with the RA 18 Midi control centre or RA 16 Easy contro...

Page 7: ...e placed Install the intermediate pieces 8 of the soapstones so that the projection will always stay on the stone i e there will always be an air gap between the stones The metal pieces are placed on...

Page 8: ...ed Install the support rods between the vertical limiters The soapstones also remain between the vertical limiters End limiter The illustration shows the installed support rods The soapstones are inst...

Page 9: ...the back remain where they are The illustration shows both the vertical and horizontal limiters of the soapstones Install the middle stones The length of the middle stones is 405mm Push the stone fir...

Reviews: