background image

 

 

User’s Manual

 

2.

 

LEASED TRANSPONDER UTILIZATION CONDITIONS 

 

The lessee is free to set his own transmission parameters (type of carrier, bandwidth, 
modulation, quality etc), provided that this does not lead to unacceptable levels of interference 

of any kind into the same or on adjacent satellites.  

 
HELLAS SAT does not allow Power Limited links unless agreed otherwise between the two 

parties.  
Before any carrier activation, HELLAS SAT will prepare a link budget analysis and the lessee 

will be asked to agree upon the operational parameters for the particular applications. 
Alternatively the lessee can submit to the planning department for approval its own 

calculations. In either way the operational parameters shall be included in an approved 
Transmission Plan. Any deviation from the approved transmission parameters requires special 

coordination and agreement by HELLAS SAT. 
 

Prior to accessing the Hellas-Sat 2 space segment capacity all transmit Earth Station operators 
have to submit to HELLAS SAT Operations Department Earth Stations approvals (Eutelsat, 

Intelsat, PanAmSat etc). In case there is no such document, The Earth Station operator should 
co-ordinate XPOL, frequency & power stability tests with HELLAS SAT NOC in advance.  

 
All transmit Earth Station operators should strictly follow the HELLAS SAT Line-Up procedures. 

The appropriate document is provided in Annex A.  
 

3.

 

CONTACT HELLAS SAT 

 

HELLAS SAT 

can be reached at: 

Tel: +30 210 6100600.  

Fax:+30 210 6111545 

http://www.hellas-sat.net

 

The HELLAS SAT Booking Office

 is manned on a 24 hour basis. For capacity reservations and 

technical matters are contact the following number: 
Tel: +30 210 630 210 6100702 

Fax: +30 210 6100700 
 

The HELLAS SAT NOC

 is manned on a 24 hour basis. For line-up procedures or emergency issues, 

contact the following numbers: 

Tel: +30 210 6116090 (primary),  
Tel: +30 210 6116091 (secondary) 

 

 

  
 

 
 

 
 

 
 

 

Summary of Contents for Hellas-Sat 2

Page 1: ...User s Manual H He el ll la as s S Sa at t 2 2 S Sa at te el ll li it te e U US SE ER R s s M MA AN NU UA AL L September 2005 1...

Page 2: ...their systems planning and implementation of satellite services However depending on the case the information and guidance provided cannot be considered as a specification but only as a reference tool...

Page 3: ...ted anywhere over the surface of the visible Earth currently pointing M East S2 and S Africa S1 1 3 FREQUENCY PLAN The frequencies and polarization arrangement of the Hellas Sat 2 satellite transponde...

Page 4: ...by channel basis It is also possible to downlink S2 channels of the 14 25 14 50 GHz band via the F2 antenna in the 11 45 11 70 GHz band but in this case the F2 channels have to be downlinked via the S...

Page 5: ...User s Manual 5 Figure 1 Hellas SAT frequency Plan...

Page 6: ...operation the Camp has 27 gain steps step 0 to 26 with a step size of 1 5 0 3 dB In ALC mode the Camp output signal power is set by telecommand to the required level while the input power may vary ov...

Page 7: ...0 80 90 74 96 76 80 71 15 9 M 88 32 79 95 91 12 80 02 87 16 81 22 82 95 77 3 13 H 94 66 86 29 97 37 86 27 93 44 87 50 89 16 83 51 Table 1 Average SFD values for transponder saturation versus sensitivi...

Page 8: ...arriers for example for 3 carriers there are 9 products and for 5 carriers there are 50 However in most cases only the third order intermodulation products falling within the frequency band of the wan...

Page 9: ...cial coordination and agreement by HELLAS SAT Prior to accessing the Hellas Sat 2 space segment capacity all transmit Earth Station operators have to submit to HELLAS SAT Operations Department Earth S...

Page 10: ...the customer must be ready to go behind specific steps Particularly the Shift Engineer will require the following step by step sequence to be precisely tagged along A CHECK IN 1 Check the antenna reg...

Page 11: ...om Satmaster indicating the required fields needed from the satellite operator G T and EIRP can be extracted from the coverages provided in Annex C G TAthens 6 6dB K EIRPLondon 53dBW SFD can be extrac...

Page 12: ...RP Pattern 8 00 7 00 6 00 5 00 4 00 3 00 2 00 1 00 0 00 1 00 2 00 3 00 4 00 Theta cos phi in Degrees 2 00 4 00 6 00 8 00 10 00 Theta sin phi in Degrees 8 37 8 6 6 6 4 4 4 2 2 2 0 0 0 SATSOFT F1 Horizo...

Page 13: ...00 6 00 4 00 2 00 0 00 2 00 4 00 Theta cos phi in Degrees 2 00 4 00 6 00 8 00 10 00 Theta sin phi in Degrees 11 10 10 8 8 8 8 8 6 6 6 6 4 4 4 2 2 2 2 SATSOFT F2 Horizontal Receive 14 021 MHz G T Patte...

Page 14: ...0 4 00 2 00 0 00 2 00 4 00 Theta cos phi in Degrees 9 00 8 00 7 00 6 00 5 00 4 00 3 00 2 00 1 00 0 00 Theta sin phi in Degrees 5 5 10 10 10 5 94 4 4 4 4 4 2 2 2 2 0 0 0 0 2 2 2 2 SATSOFT S1 Vertical R...

Page 15: ...2 4 4 4 4 6 6 6 6 6 8 8 8 8 8 10 10 10 10 12 12 12 12 14 14 14 14 SAT SOF T S2 Vertical Receive 14 476 MHz G T Pattern 6 00 4 00 2 00 0 00 2 00 4 00 6 00 Theta cos phi in Degrees 1 00 0 00 1 00 2 00 3...

Reviews: