Rod unit

1x

2

1

3

Fill the hole with concrete up to a few

centimeters below ground level.

Make a hole for the concrete at your 

chosen location. The hole for a PV-6 

should be at least 80x80 cm, 1 m 

deep (~600 liter).

Push the rod unit into center of the 

concrete and let the flange rest on 

top of the concrete. Use a spirit level 

to align the flange horizontally.
Allow the concrete time to harden 

before assemling the remainder of 

the power plant. The concrete can 

be covered with sand after it has 

cured for 2 weeks.

Soil founda�on

Summary of Contents for HELIOMOTION PV-6

Page 1: ...QUICK ASSEMBLY GUIDE PV 6 HELIOMOTION HelioZenit Revision 1 2021...

Page 2: ...1x 1x PART I FOUNDATION...

Page 3: ...should be at least 80x80 cm 1 m deep 600 liter Push the rod unit into center of the concrete and let the flange rest on top of the concrete Use a spirit level to align the flange horizontally Allow t...

Page 4: ...template Make the holes 20 mm wide and 250 mm deep Use compressed air to remove any debris and water from the holes to ensure a clean bonding surface Fill the holes 2 3 full with chemical anchor adhes...

Page 5: ...accurate than a regular compass 3 Align the phone to true south or north according to the compass 4 Rotate the column so that the edge of the tube lines up with the edge of the phone Make sure the co...

Page 6: ...1x 1x 6x 4x PART II TRACKER...

Page 7: ...6x 4x 1x 1x 1 2...

Page 8: ...2x 1x 1x 20x 2x 4x 8x 1x 2x 2x 4x PART III FRAMEWORK...

Page 9: ...2300mm 2000mm 150mm 150mm 2x 2x 4x 2 1...

Page 10: ...2x 960mm 960mm 2x 45mm 45mm 4 3...

Page 11: ...592mm 592mm 1x 1x 4x 1 2 1x 5 6...

Page 12: ...16x 45mm 600mm 600mm 45mm Tighten the M16 nut slightly on both sides 8 7 1 2...

Page 13: ...645mm 645mm X 1324mm X X Panel width 3 1324 2 4x 9...

Page 14: ...6x 10x 10x 24x PART IV PANELS...

Page 15: ...ame with four panel clamps C Remove the extension rod and attach only the black angle rod Make sure to prevent the panels from swinging downwards when changing the rod Leave both fork joints F and one...

Page 16: ...n Standard applications are listed below String inverter Grid tied string inverters generally supports a high voltage PV input Therefore all 6 panels are typically connected in series when using a str...

Page 17: ...C U must be connected by a certified electrician However preparation work may be done by a layman as long as local code requirements are followed AC wires must be at least 1 5mm thick and use an outdo...

Page 18: ...round are properly attached and protected so the cable cannot be accidentally moved or damaged Sections coming out of the ground need to be protected by for example a metal U profile 4 Fill out and at...

Page 19: ...llation the junction box K can be wired as shown above If the string inverter is placed on the column of the solar installation the 24VDC transformer can be added to the outdoor junction box K along w...