Rod unit
1x
2
1
3
Fill the hole with concrete up to a few
centimeters below ground level.
Make a hole for the concrete at your
chosen location. The hole for a PV-6
should be at least 80x80 cm, 1 m
deep (~600 liter).
Push the rod unit into center of the
concrete and let the flange rest on
top of the concrete. Use a spirit level
to align the flange horizontally.
Allow the concrete time to harden
before assemling the remainder of
the power plant. The concrete can
be covered with sand after it has
cured for 2 weeks.
Soil founda�on
Summary of Contents for HELIOMOTION PV-6
Page 1: ...QUICK ASSEMBLY GUIDE PV 6 HELIOMOTION HelioZenit Revision 1 2021...
Page 2: ...1x 1x PART I FOUNDATION...
Page 6: ...1x 1x 6x 4x PART II TRACKER...
Page 7: ...6x 4x 1x 1x 1 2...
Page 8: ...2x 1x 1x 20x 2x 4x 8x 1x 2x 2x 4x PART III FRAMEWORK...
Page 9: ...2300mm 2000mm 150mm 150mm 2x 2x 4x 2 1...
Page 10: ...2x 960mm 960mm 2x 45mm 45mm 4 3...
Page 11: ...592mm 592mm 1x 1x 4x 1 2 1x 5 6...
Page 12: ...16x 45mm 600mm 600mm 45mm Tighten the M16 nut slightly on both sides 8 7 1 2...
Page 13: ...645mm 645mm X 1324mm X X Panel width 3 1324 2 4x 9...
Page 14: ...6x 10x 10x 24x PART IV PANELS...