VARIO-PERGOLA
INSTALLATION INSTRUCTIONS
Helioscreen Australia Pty Ltd
Page 13
4. INITIAL OPERATION
!
Before the initial operation of the awning, remove all objects (e.g. ladders, tools etc.) from the full travel rang (in/out) of
the awning and from underneath the awning. During the trial operation, ensure that nobody is in this area – there is a
risk of injury in case of a malfunction.
!
For trial operation, always use the test cable (no automatic control units etc.). In addition, the operator must be able to
see the awning. If the test cable has not yet been connected, connect to the cable of the driving gear.
Fully extend awning and check switch-off point.
!
Electrical installation work and connections to the mains must be carried out exclusively by a licensed electrical
company.