![Heliodyne GOBI 406 001 Installation Manual Download Page 16](http://html.mh-extra.com/html/heliodyne/gobi-406-001/gobi-406-001_installation-manual_2120660016.webp)
HPAK INSTALLATION INSTRUCTIONS
Figure 3.4.-1: HPAK Tank Mounting
6”
W
all Mount
W
all Mount
Tank Mount
Tank Mount
3.4. Helio-Pak Tank Mounting
Choose the mounting location for the HPAK. Using the X-Bracket supplied with the HPAK, measure and level a spot 6” down from the
desired position of the top of the HPAK foam. With the 4 self - tapping screws provided with the HPAK; on a tank use the inner mounting
holes on the curved part of the X, on a wall, use the outer mounting holes on the flattened part of the X. Align the top and bottom lugs on
the X with the top and bottom mating holes on the HPAK pre-mounted bracket and hang. Pull the HPAK down to lock in the lugs with the
HPAK bracket holes.
3.5. Expansion Tank Mounting
Helio-Paks come with a pre-sized expansion tank of bladder type. If the shipped expansion tank volume is less than 1/5
th
of the total
collector system fluid volume, contact Heliodyne to purchase the appropriate additional expansion.
Orientation of the bladder type tanks does not matter; any location using the expansion tank port and flex hose provided with the HPAK
is acceptable.