❏
6. Locate the 3 control rods and the 6 ball link ends.
1) Pitch (54mm)
2) Elevator (48mm)
3) Aileron (41mm)
All measurements are overall length with the ball links
threaded on to the metal rods.
❏
7. Install the Aileron control linkage as shown.
❏
8. Install the Pitch control linkage as shown.
❏
9. Install the elevator control linkage as shown. Be sure that
the swash plate is level with all the control arms and the servos
are horizontal. If they are not, remove and adjust accordingly.
❏
10. Install the ball link to the rudder control linkage and
snap it on the ball attached to the control arm.
❏
11. Install the Futaba 401 gyro on the top of the frames
as shown with double sided foam tape. Be sure the surface
is clean to get a good bond. An optional mount (HMXE7921)
is available for a more secure mounting, if desired.
INSTALL
GYRO, ESC & RECEIVER
INSTALL LINKAGES
6