![Hekatron LRS 01 Installation Instructions Manual Download Page 14](http://html1.mh-extra.com/html/hekatron/lrs-01/lrs-01_installation-instructions-manual_2120422014.webp)
Installation Instructions LRS 01
14
HEKATRON Vertriebs GmbH · Brühlmatten 9 · D-79295 Sulzburg
7002428 100206.VDA Ausgabe 10.02.2006
Installation Instructions LRS 01
15
7002428 100206.VDA Ausgabe 10.02.2006
HEKATRON Vertriebs GmbH · Brühlmatten 9 · D-79295 Sulzburg
6 Commissioning
Before commissioning the Smoke Switch in a ventilation system, the air ducts
and the LKS 02 must be cleaned carefully. Only then should the Smoke Switch
be removed from its packing and fitted to the LKS 02 socket.
6.1 Functional testing
Testing must comprise at least the following points:
The interaction of all items of equipment and their technical condition must be
checked. A check must be carried out to ensure that the detection parameter
(smoke) to which the optical Smoke Switch should react, can reach it. For func-
tional testing of the Smoke Switch ORS 210, test aerosol 918/5 must be used.
Test aerosol 918/5 is free of halogenated hydrocarbons (CFCs etc.). If a Smoke
Switch does not react when so tested, then it must be replaced. The inlet tube
must be free of any obstructions.
Warning!
The warnings and safety instructions on the aerosol can must be observed
without fail.
These tests and maintenance must only be carried out by a specialist or a person
trained to do so. The tests and their results are to be recorded in a logbook.
6.2 Display of operating status of the
ORS 210
Signal, frequency
Colour of LED
Meaning
green
Operating status
green/yellow
Slight contamination
green/yellow
Heavy contamination
yellow
Fault
red
Alarm
„Off“
No power