Fehler! Verweisquelle konnte nicht gefunden werden.
Operation
Explosion Proof Actuators StG 2120.xx, StG 30.90-xx, StG 40.90-xx
12
5
Operation
5.1
Commisioning
Any works on the actuators may be performed only by properly trained
specialists and in compliance with applicable standards.
The user is responsible for correct and proper commissioning of the installation as a whole.
Please note before commissioning the installation:
Before starting to install any equipment, the installation must have been switched
dead!
Check the functionability of the existing protection and monitoring systems.
Commissioning may be conducted only with the cover of the terminal box mounted.
5.2
Operation
The actuator must be operated in such manner as to safely exclude any damages.
With particular regard to electric and technical operating, the device may be used only in
conformance with the specifications.
Warning