8
11 Plug in right-angle lightning cable
12 Install front bezel
Page 1: ...ed to be free from defect for a period of one year from the original date of purchase If you discover a defect please contact service hecklerdesign com Heckler Design will repair at our discretion using new or refurbished components If repair is not possible Heckler Design will replace the item Compatible with iPad 10 2 inch 7th Generation HecklerAV iPadWallMount plusPoEPower SecureWallEnclosurefo...
Page 2: ...1x Torx assembly tool F756 1 1 1x Hex assembly tool F529 4x 4x Drywall Mounting Screws Drywall Mounting Mollies F360 F155 Drill Marker Wire cutter ...
Page 3: ...1 Remove front bezel 2 Disassemble screws 3 F529 ...
Page 4: ...3 Install iPad 4 Mark four mounting position and 4 CAT cable position Mark the circle concentric to the cutout F529 Please place iPad aligned to the slot ...
Page 5: ...5 Install Drywall Mounting Mollies 5 6 Drill CAT cable pass through hole Please drill a 1 2 inch hole for CAT cable to pass through F155 ...
Page 6: ...7 Pull out CAT cable 6 8 Fasten back plate F360 ...
Page 7: ...t cable skin 7 10 Plug four wires into the 24V passive PoE splitter Please match the wire color indicator on the plastic case Please only use the 24V PoE injector 1 Open caps 2 Insert wires 3 Close caps 4 Done ...
Page 8: ...8 11 Plug in right angle lightning cable 12 Install front bezel ...
Page 9: ...9 13 Tighten four screws Tip Access Sleep Wake button F756 F756 Please tighten all four screws located on the third slot of each side ...