VENTED WATER HEATER COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the vented water heater as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer’s statutory rights.
Customer name:
Telephone number:
Address:
Make and model:
Serial number:
Commissioned by (PRINT NAME):
Commissioning date:
ID No:
Location:
Company name:
Company address:
Telephone number:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
subtitle?
No
Yes
Is the breather pipe installed to BS6700?
What is the static head?
metres
Is the installation in a hard water area (above 200ppm)?
If yes, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
What is the hot water thermostat set temperature?
° C
What is the hot water temperature at the nearest outlet?
° C
All appropriate pipes have been insulated up to 1 metre or the point where they become concealed?
The hot water system complies with the appropriate Building Regulations?
Does the installation require any additional ventilation requirements as detailed in the manufacturer’s instructions?
The system has been installed and commissioned in accordance with the manufacturer’s instructions?
The system controls have been demonstrated to and understood by the customer?
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer?
Customer’s Signature: Commissioning Engineer’s Signature:
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
© Heating and Hot Water Industry Council (HHIC)
*All installations in England and Wales must be notified to be Local Authority Building Control (LABC) either directly or through a Competent
Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
www.centralheating.co.uk
Summary of Contents for R 45 PLUS 3KW
Page 1: ...R PLUS Installation operation and maintenance manual...
Page 31: ...31 1 3 4 5 7 8 9 10 2 6...
Page 32: ...32 15 9 10 11 12 13 14...
Page 33: ...33 16 17 18 22 19 21 20 1 23 22 23 24 28 26 25 27 29...
Page 34: ...34 30 31 32 33 34 35...
Page 38: ...38...
Page 39: ...39...