STEP 1. Place 2 brick risers at back of grate as shown here.
STEP 2. Place the back log H-0809 on top of the brick risers.
Then place logs H-0811 & H-0810 on the floor in front of the grate.
STEP 3. Place the 2 front logs H-0815 & H-0808 as shown below.
STEP 4. Place logs H-0806 & H-807 first as shown below. Then place logs H-0805 & H-0800.
H-0810
H-0811
H-0809
H-0806
H-0807
H-0808
H-0815
H-0805
H-0800
Blue Ridge Blaze / Western Blaze 24” on DGSS Burner