![Heatilator ECO CHOICE ECO-ADV-WS22 Owner'S Manual Download Page 25](http://html1.mh-extra.com/html/heatilator/eco-choice-eco-adv-ws22/eco-choice-eco-adv-ws22_owners-manual_2117336025.webp)
7057-128K • October 24, 2018
25
ECO-ADV-WS22
www.heatilatorecochoice.com
Figure 25.1
Baffle Boards & Blanket even with
front tube and resting on tubes
Baffle
Protection
Channel
Ceramic Blanket on Top
Tube Channels
2 pc
Baffle
Board
Burn
Rate Air
Control
1.
Remove all ash from the firebox, and extinguish all hot
embers before disposal into a metal container.
2.
Remove the baffle protection channel by rotating it
down from the front tube
(Figure 25.1)
.
3. Remove tube channel assembly (see section
Tube
Channel Assembly Replacement
on page 26).
4.
The baffle board has 2 pieces. With the ceramic
blanket still in place, slide one baffle piece over the top
of other one and pull out top piece through the door
opening and then remove bottom baffle piece.
5. Remove the ceramic blanket.
6. Re-install the ceramic blanket and smooth out the
blanket.
7.
Slide the baffle pieces one piece at a time underneath
the blanket. Be sure the baffle boards are even with the
front manifold tube and is resting on all tubes
(Figure
25.1)
.
8. Re-install the tube channel assembly (see section
Tube Channel Assembly Replacement
on page 26).
9.
Re-install the baffle protection channel by rotating it
up and around the front tube so the bottom flange of
the channel rests behind the manifold tube. The baffle
boards and blanket are tucked inside the rear of the
baffle protection channel.
E. Baffle Removal