![HeatFab Saf-T Vent CI Plus Installation Instructions Download Page 4](http://html1.mh-extra.com/html/heatfab/saf-t-vent-ci-plus/saf-t-vent-ci-plus_installation-instructions_2116375004.webp)
PI-CCGUY 112602
APPLICATION 4.
Support Above a Floor
(
Figure 7
)
The guy support may be set on lengths of
metal bracing that are secured to the floor.
Make sure that the guy brackets are
positioned over the metal bracing. Drill
through the metal bracing and secure with
appropriate nuts and bolts. Do not
completely tighten, to allow for expansion
and contraction of the system.
APPLICATION 5.
Support Horizontally
(Figure 8)
Support horizontally by attaching guy wires,
chains or threaded rod to the guy support bracket
holes. Anchor the guy lines to the building
infrastructure on the underside of the floor or roof.
Floor / Roof
Anchor to Bottom
of Floor / Roof
Guy Support,
Preferred Option
Guy Support,
Option Two
Figure 6
www.heat-fab.com 800.772.0739
Figure 7
Floor
Metal Cross Brace
Fasten
Brackets
to Bracing
Guy Support
Guy Line
Floor or
Roof
1/4" Pitch
per Foot
Guy Support
Figure 8
Guy Line
Typical of 4
APPLICATION 3.
Support Below a Floor or Roof
(Figure 6).
Attach guy wires, chains, or threaded rod with a
minimum rated capacity of 500 lbs. to the four hole
locations on the support brackets. Anchor the guy
lines to the building infrastructure on the underside
of the floor or roof. Continue to attach vent lengths
above and below the guy support.
Preferred Option
: Install the Guy Support above
the Boot Tee.
Option Two
: Install the Guy Support below the
Boot Tee.