GENERAL

 

1.1 

All work should be carried out by suitable qualified personnel. 

1.2 

Carefully remove all protective packaging and visually inspect unit for any transit damage. 

1.3 

Heaters must be handled with care and stored in dry conditions. 

1.4 

CAUTION

 – Air warmers over 1m long are HEAVY and must be handled appropriately. 

 

32kg 

 

FAW2000 

 

38kg 

 

FAW2500 

 

42kg 

 

FAW3000 

 

up to 34kg 

FCR2 

 

up to 49kg 

FCR3 

1.5 

Before connection ensure that the supply corresponds with that specified on the rating label. 

1.6 

Ensure that the sizes and types of cables to be used are suitably rated for the load and 
temperature of the unit. 

1.7 

Each heater must be protected by a suitably rated over current device. 

1.8 

All prevailing rules, regulations and bylaws in force at the time and place of installation must 
be observed. 

1.9 

The heater should be securely fixed in position and all terminal connections checked for 
tightness before energising. 

1.10 

Any modification not carried out by Exheat Industrial Ltd will invalidate certification and 
warranty. 

1.11 

Refer to the relevant code of practice for the equipment: 

 

IEC/EN 60079-14 

for selection and installation 

 

IEC/EN 60079-17 

for inspection and maintenance of electric apparatus for use in 

potentially explosive atmospheres. 

1.12 

All electrical testing must be carried out in a non-hazardous area. 

1.13 

Precautions must be taken to prevent damage to machined surfaces and threads of 
flameproof enclosures. 

1.14 

Ensure that any special conditions for safe use detailed on the Hazardous Area Certification 
are complied with. 

 

2.0 

STORAGE

 

2.1 

Store the equipment in an inside location that is dry, clean and well ventilated. 

2.2 

Suitable preservation materials, such as silica gel bags or equivalent, have been placed 
inside the packaging. Additionally, spare silica gel bags, or equivalent, can be supplied by 
contacting Exheat Industrial Ltd. 

2.3 

If the equipment is stored beyond 3 months, ensure that preservation materials are replaced. 

2.4 

CAUTION

 – It is the client’s responsibility to ensure that, if the terminal enclosure is opened 

prior to installation, these bags are checked and replaced if necessary. When refitting terminal 
enclosure lid please ensure the gaskets are not damaged or moved in any way and for the 
HFT & AFT thermostats please refer to section 5.0 below. 

2.5 

CAUTION

  –  The following preservation instructions must be adhered to. Failure to do so 

could result in the equipment warranty being invalidated: 

 

Store the equipment at a temperature within the ambient temperature shown on the 
nameplate. 

 

Ensure that the equipment is not subjected to direct sunlight at ambient temperatures 
above +30°C. 

 

Summary of Contents for AFT Series

Page 1: ...RUCTIONS FAW FAW C FAW C T TYPE AIR WARMERS FCR FCR A TYPE CONVECTORS STW STW T SAFE AREA AIR WARMERS HFT AFT SAT TYPE AIR THERMOSTATS Please read these instructions thoroughly before installation and...

Page 2: ...NECTION 4 6 0 EARTH CONNECTION 4 7 0 OPERATION 5 8 0 MAINTENANCE 5 9 0 MARKING 6 10 0 CERTIFICATION 6 APPENDIX A WIRING DIAGRAMS 7 APPENDIX B HEATER GENERAL ARRANGEMENT DRAWINGS 18 To maintain the equ...

Page 3: ...se in potentially explosive atmospheres 1 12 All electrical testing must be carried out in a non hazardous area 1 13 Precautions must be taken to prevent damage to machined surfaces and threads of fla...

Page 4: ...ld be recorded Should the whole heater be below this value each element would need to be checked to ascertain which one was low in resistance 3 2 2 Use the continuity Ohms setting on the elements and...

Page 5: ...ably certified cable glands and IP washers not supplied and be fitted by a qualified person Any unused entries should remain plugged with the factory fitted certified Ex d plugs if installed or with s...

Page 6: ...1 All prevailing site safety regulations shall be adhered to at all times 8 2 Equipment shall be checked regularly for any dust accumulation which must be removed from all surfaces 8 3 Before and whil...

Page 7: ...nths carry out 6 monthly maintenance before energizing 9 0 MARKINGS 9 1 FAW FAW C FCR Range II 2 G Ex e IlC T4 to T2 Gb 9 2 FAW C T and FCR A with Integral Thermostat II 2 G Ex d e IlC T4 to T2 Gb 9 3...

Page 8: ...7 APPENDIX A WIRING DIAGRAMS...

Page 9: ...8...

Page 10: ...9...

Page 11: ...10...

Page 12: ...11...

Page 13: ...12...

Page 14: ...13...

Page 15: ...14...

Page 16: ...15...

Page 17: ...16...

Page 18: ...17...

Page 19: ...18 APPENDIX B HEATER GENERAL ARRANGEMENT DRAWINGS...

Page 20: ...19...

Page 21: ...20...

Page 22: ...21...

Page 23: ...22...

Page 24: ...23...

Page 25: ...24...

Page 26: ...Thetford IP25 6NG Tel 44 0 1953 886210 Fax 44 0 1953 883853 For sales and new product information see our website www exheat industrial com Author P Bumstead Issue Date April 2019 Issue K_English A4 p...

Reviews: