
10
1. Place the insert into position.
2. Level the insert from side to side and from front
to back.
•
If necessary use the legs included in the
manual bag. Screw the legs into the nuts
installed in the bottom rear of the insert. Turn
legs in until insert is level.
Step 3
The Gas Control
Systems
WARNING
THIS UNIT IS NOT FOR USE WITH
SOLID FUEL.
The gas control systems used with this model is
Standing Pilot Ignition.
Standing Pilot Ignition System
This system includes millivolt control valve,
standing pilot, thermopile/thermocouple flame
sensor, and piezo ignitor.
WARNING
110-120 VAC MUST NEVER BE
CONNECTED TO A CONTROL VALVE IN
A MILLIVOLT SYSTEM.
Step 5
Gas Pressure
Requirements
Step 2
Positioning,
Leveling, and
Securing the
Insert
3/8" (10 mm)
STANDING PILOT
Figure 6. Gas Controls Systems
Summary of Contents for BAY-INS
Page 12: ...9 Figure 4 Figure 5...