Step 11.  Before Lighting  the Fireplace

Before

 lighting the fireplace, be sure to do the following:

Remove all paperwork from underneath the fireplace.
Review safety warnings and cautions

• Read the 

Safety and Warning Information

 section at

the beginning of this 

Installers Guide

.

Double-check for gas leaks

• Before lighting the fireplace, double-check the unit for

possible gas leaks.

Double-check vent terminations and front grilles for

obstructions.

• Before lighting the fireplace, double-check the unit for

possible obstructions that could be blocking the vent ter-

minations or the front grilles.

Double-check for faulty components

• Any component that is found to be faulty 

MUST BE

 re-

placed with an approved component. Tampering with the

fireplace components is 

DANGEROUS

 and voids all war-

ranties.

A small amount of air will be in the gas supply lines. When

first lighting the fireplace, it will take a few minutes for the

lines to purge themselves of this air. Once the purging is

complete, the fireplace will light and will operate normally.

NOTE:

 The fireplace should be run for 8 hours on the initial

start-up. This will help to cure the chemicals used in the

paint and logs.
Subsequent lightings of the fireplace will not require this

purging of air from the gas supply lines,

 unless

 

the gas

valve has been turned to the OFF position

, in which

case the air would have to be purged.

!

!

Step 12.   Lighting the Fireplace

You’ve reviewed all safety warnings, you’ve checked the

fireplace for gas leaks, you know the vent system is

unobstructed, and you’ve checked for faulty components.

Now you’re ready to light the fireplace.

WARNING: PLEASE REFER TO THE USER’S

MANUAL FOR ALL CAUTIONS, SAFETY,  AND

WARNING INFORMATION PERTAINING TO THE

LIGHTING AND OPERATION OF THE FIREPLACE.

After the Installation

LEAVE THIS INSTALLATION MANUAL WITH

THE APPLIANCE FOR FUTURE REFERENCE.

Summary of Contents for 6000XLSB

Page 1: ...TH APPLIANCE FOR FUTURE REFERENCE 1 This appliance may be installed in an af termarket permanentlylocated manufac tured mobile home wherenotprohibited by local codes 2 Thisapplianceisonlyfor usewithth...

Page 2: ...he installation FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty Prior to the first firing of the fireplace READ the Using Your Firepla...

Page 3: ...ing the Vent System 13 A Vent System Approvals 13 B Installing Vent Components 16 C Vent Termination 20 Step 4 Positioning Leveling and Securing the Fireplace 23 Step 5 The Gas Control Systems 23 Step...

Page 4: ...SAC22 1 Canadian Electric Code in Canada These models may be installed in a bedroom or bed sitting room in the U S A and Canada 1Approvals and Codes High Altitude Installations U L Listed gas fireplac...

Page 5: ...enefit Failure to follow these instructions will void the owner s warranty and may present a fire hazard The Heat N Glo Warranty will be voided by and Heat N Glo disclaims any responsibility for the f...

Page 6: ...10 Figure 1 Diagram of the 7000XLS and 6000XLSB...

Page 7: ...ance diagrams on pages 19 and 20 in this manual Step 2 Framing the Fireplace Fireplace framing can be built before or after the fireplace is set in place Framing should be positioned to accommo date w...

Page 8: ...AP 1 3 8 INCHES 34 93mm AT EACH JOINT DV 36D 5 3 4 146mm 8 3 4 222mm 11 3 4 298mm DV 12D DV 09D DV 06D DV 48D DV 90D 7 3 8 187mm 6 5 32 156mm 11 5 8 295mm 11 15 16 303mm 5 7 8 149mm 8 5 8 220mm 8 1 2...

Page 9: ...etailed installation instructions are included with each vent termination kit and should be used in conjunction with this Installers Guide Theflameandemberappearancemayvarybasedonthetype of fuel burne...

Page 10: ...stall the vertical baffle included in the manual bag assembly to improve flame appearance Figure 7 Venting with One 90 Elbow VENTING WITH ONE 1 90 ELBOW Figure 8 Venting with Two 90 Elbows VENTING WIT...

Page 11: ...86 m 18 MAX 5 485 m 4 MIN 1 22 m 8 MAX 2 48 m 24 MAX 7 31 m V1 V H H1 40 MAX 12 4m 8 MAX 2 48m 24 MAX 7 31m V H H H1 1 MIN 305 mm 2 MAX 610 mm 6 MAX 1 82 m 2 MIN 610 mm 4 MAX 1 22 m 12 MAX 3 65 m 3 M...

Page 12: ...ent end with four 4 equally spaced indented sections When the internal beads of each 8 5 8 inch 219mm outer pipe line up rotate the pipe section clockwise about one quarter 1 4 turn Theventpipeisnowlo...

Page 13: ...eding component in the vent system 90 elbows may be installed and rotated to any point around the preceding component s vertical axis If an el bow does not end up in a locked position with the pre ced...

Page 14: ...ops for horizontal runs that pass through either interior or exterior walls Cut a 12 inch by 12 inch 305mm X 305mm hole through the wall NOTE The center of the hole is one 1 inch 25 4mm above the cent...

Page 15: ...11 inch 280mm X 280mm hole through the ceiling using the centerpoint previously marked Frame the hole with framing lumber the same size as the ceiling joists Figure 18 Ceiling Firestop Ceiling Side If...

Page 16: ...of the wall firestop to secure the vent pipe in place For trapezoidal cap termination kits Using screws secure the cap to the exterior wall through the flanges in the cap Figure 20 Round Trapezoid Ter...

Page 17: ...oor that may be opened C 9 U S A 12 Canada clearance to permanently closed window D 18 vertical clearance to ventilated soffit located above the termi nal within a horizontal distance of 2 feet 60 cm...

Page 18: ...FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS PROVIDED THE TERMI NATION CAP IS AT LEAST TWO 2 FEET FROM A VERTICALWALLAND 2 FEET BELOWA HORIZON TAL OVERHANG NOTE This also pertains to vertical vent systems i...

Page 19: ...ition level and secure the fireplace Figure 23 Proper Positioning Leveling and Securing of a Fireplace Figure 24 Gas Control System STANDING PILOT Step 5 The Gas Control System WARNING THIS UNIT IS NO...

Page 20: ...fireplace lower grille insert the gas supply line through the gas line hole and connect it to the shut off valve When attaching the pipe support the control so that the lines are not bent or torn Afte...

Page 21: ...itch in the desired position on a wall Run a maximum of 25 feet 7 8 m or less length of 18 A W G minimum wire and connect it to the fireplace ON OFF switch pigtails WARNING DO NOT CONNECT 110 120 VAC...

Page 22: ...IF JOINTS BETWEEN THE FINISHED WALLS AND THE FIREPLACE SURROUND TOP AND SIDES ARE SEALED A 300 F MINIMUM SEALANT MATE RIAL MUST BE USED THESE JOINTS ARE NOT RE QUIRED TO BE SEALED ONLY NON COMBUSTIBL...

Page 23: ...gs might need to be repositioned slightly to avoid excessive flame impingement Step 10 Installing Trim Logs and Ember Material Placing the Ember Material Ember material is shipped with this gas firepl...

Page 24: ...n the gas supply lines When first lighting the fireplace it will take a few minutes for the lines to purge themselves of this air Once the purging is complete the fireplace will light and will operate...

Page 25: ...ncy Once annually By Qualified service technician Task Brush or vacuum the control compartment fireplace logs and burner areas surrounding the logs Checking Flame Patterns Flame Height Frequency Perio...

Reviews: