Heat Controller MGD-B Series Owner'S Manual Download Page 5

Heat Controller, Inc. 

MGD-B SERIES GAS FURNACE

 

Owner’s Manual

G18D Series Gas Furnace

 OWNER’S MANUAL

Mortex Products Inc. / Fort Worth, TX 76106

    G18D Owner’s Manual

  

4

The igniter warm-up period is extended to 27 seconds then, 
24 VAC is sent to the gas valve solenoid opening the solenoid 
and star

ti

ng the 

ow of gas. If a 

ame is established for more 

than 10 seconds during the retry the unit will con

ti

nue to 

operate normally and the control board will clear the igni

ti

on 

retry counter. If a 

ame has not been established then the 

control board will advance the retry counter and will con

ti

nue 

the igni

ti

on retry opera

ti

on. The igni

ti

on retry opera

ti

on will 

a

tt

empt to re-ignite the gas burner a total of three igni

ti

on 

cycles during a call for heat from the thermostat. If the 
burner 

ame has not been established a

ft

er the third igni

ti

on 

retry cycle the control board will go into a so

ft

 lockout for a 

period of one hour. If there is s

ti

ll a call for heat a

ft

er the one 

hour lockout the furnace will ini

ti

ate a normal start cycle. If 

the problem has not been corrected the furnace will lockout 
again a

ft

er the three igni

ti

on retries.  

Call For Heat Removed 

If the call for heat from the thermostat is removed from the 
control board before the board can resume normal opera

ti

on 

the control board will clear the igni

ti

on retry counter, will 

clear a so

ft

 lockout and will clear any fault codes. 

 

 

Call For Heat Removed With Gas Valve Stuck Open 

If the furnace is running normally and the call for heat from 
the thermostat has been removed the 24 VAC signal to the 
gas valve solenoid will be removed. If the control board 
so

ft

ware indicates a microamp signal is present at the 

ame 

sensor indica

ti

ng a 

ame is present the control board will 

keep 115 VAC present to the combus

ti

on air booster motor, 

115 VAC to the heat terminal for the indoor fan to keep the 
indoor fan motor energized and will 

ash a error code of 5 

ashes indica

ti

ng a 

ow of gas with no call for heat. The 

furnace will con

ti

nue to operate at this condi

ti

on un

ti

l the 

gas 

ow has been interrupted and the 

ame has been 

ex

ti

nguished. 

 

 

 

OBSERVING BURNER OPERATION

The combus

ti

on air booster motor is located inside the white 

plas

ti

c assembly a

tt

ached to the 4” round galvanized pipe. 

When the combus

ti

on air booster motor has been energized 

the fans create a 

ow of air through the booster motor 

assembly and the burner box that produces a nega

ti

ve 

pressure at the top of the booster motor assembly and a 
posi

ti

ve pressure at the burner box.  A tube is a

tt

ached to the 

pressure port at the top of the booster motor assembly and 
the top of the burner box that extends to the pressure ports 
on the pressure switch, providing the nega

ti

ve and posi

ti

ve 

pressures to the switch.  If the pressures applied to the 
posi

ti

ve and nega

ti

ve ports (Di

eren

ti

al Pressure) of the 

pressure switch exceed -0.2” wc +/ .05” wc the switch 
electrical contacts close providing a 24 VAC signal back to the 
control board thru the blue wires a

tt

ached to the 9 pin plug 

indica

ti

ng to the control board so

ft

ware the pressure switch 

has closed.  
When the pressure switch has closed the control board starts 
a 30 second igni

ti

on warm up. This gives the hot surface 

igniter 30 seconds to obtain its normal opera

ti

ng 

temperature. A

ft

er the 30 second igni

ti

on warm up, the 

control board sends 24 VAC to the thru the brown wires  on 
the 9 pin plug to the gas valve solenoid for 10 seconds which 
will open the gas valve and start the 

ow of gas. The hot 

surface igniter should ignite the 

ow of gas and start the 

ame stabiliza

ti

on period. During the 

ame stabiliza

ti

on 

period the 

ame sensor will send a microamp signal of 1.5 

to 3.7 microamps

 

(0.0000015 to

 

0.0000036 amps)

  thru

  the 

yellow wire  that is connected to the 9 pin plug on the control 
board signaling to the control board so

ft

ware that a 

ame is 

present. The indoor blower 

ti

me delay will start a 50 second 

on delay a

ft

er the 

ame stabiliza

ti

on period has concluded 

and the control board will place 115 VAC on the HEAT 
terminal of the control board energizing the indoor fan in the 
hea

ti

ng mode. The furnace will con

ti

nue to operate un

ti

l the 

call for heat from the thermostat has been sa

ti

s

ed. At this 

point the gas valve solenoid will be de-energized, the burner 

ame will be ex

ti

nguished and the control board so

ft

ware will 

start a 50 second indoor fan o

 delay. When the indoor fan 

has de-energized the control board will indicate a steady 
green light on the diagnos

ti

c indicator indica

ti

ng the control 

board is ready to resume normal opera

ti

on. 

Igni

ti

on Retry 

If the burner 

ame has not been established or has been 

interrupted when the thermostat is calling for heat; the 
control board will start the igni

ti

on retry opera

ti

on. During 

the retry opera

ti

on the combus

ti

on air booster motor will 

con

ti

nue to operate. The control will start a 15 second purge 

to vent any unburned gas from the heat exchanger.  

1.  Observe burner to make sure it ignites and to 

observe the 

ame color. With Natural gas, the

 

ame will be blue with yellow 

ti

ps; with Propane

 

gas, a yellow 

ame can be expected.

 

2.  Allow furnace to heat up un

ti

l the blower cycles on. 

(2-1/2 min.) 

3.  Turn wall thermostat down. 

4.  Observe main burner 

ame to make sure it shuts   

o

.

5.  Let furnace cool and blower turns o

6.  If any abnormali

ti

es should occur, such as the burner 

failing to light or to turn o

, the 

ame looks sooty or

it seems to be “

oa

ti

ng” around inside the heat

 

exchanger, call a quali

ed service technician for

service.

 

4

Summary of Contents for MGD-B Series

Page 1: ...OWNER S MANUAL Manufactured Home Downflow Gas Furnace MGD B Series Heat Controller Inc 1900 Wellworth Ave Jackson MI 49203 517 787 2100 www heatcontroller com ...

Page 2: ...Owner s Manual MGD B SERIES GAS FURNACE Heat Controller Inc 1 ...

Page 3: ...Heat Controller Inc MGD B SERIES GAS FURNACE Owner s Manual See warranty card that was provided with your unit 2 ...

Page 4: ...ill place 115 VAC on the HEAT terminal on the control board at the completion of the time delay and allow the blower motor run on the selected blower motor speed tap Power ON When the line power 115 VAC is turned on to the furnace the 115 VAC is applied between the L1 terminal and the neutral terminal on the control board The step down transformer applies 24 VAC to the 24 VAC and the COM terminals...

Page 5: ...the pressure ports on the pressure switch providing the negative and positive pressures to the switch If the pressures applied to the positive and negative ports Differential Pressure of the pressure switch exceed 0 2 wc 05 wc the switch electrical contacts close providing a 24 VAC signal back to the control board thru the blue wires attached to the 9 pin plug indicating to the control board softwa...

Page 6: ... turns on the blower when sufficient heat has built up inside the furnace Gas Valve The gas valve for all models are 100 shut off type and will fail safe if for some reason the gas is turned off INSPECTION AND MAINTENANCE BY THE HOMEOWNER Make a visual inspection of the furnace every 30 days Do the following Filters Clean filters at least every 3 months and replace as needed Size 16 x20 x1 Motor L...

Page 7: ... 7 MICROAMPS 0 000001 0 0000037 AMPS WITH THE CURRENT METER CONNECTED IN SERIES BETWEEN THE FLAME SENSOR AND THE CONTROL BOARD THEN UNPLUG THE 9 PIN PLUG AT THE CONTROL BOARD AND PERFORM A RESISTANCE TEST OHM Ω TEST ON THE YELLOW FLAME SENSOR WIRE IF THE OHMS Ω METER DOES NOT INDICATE A READING OR SHOWS THE SYMBOL SHOWS A OPEN WIRE THEN REPLACE THE FLAME SENSOR WIRE OR THE WIRE HARNESS IF THE OHMS...

Page 8: ... TERNINALS THEN GO TO STEP 6 IF THERE IS 24 VAC TO THE GAS VALVE ELECTRICAL TERMINALS THE GAS VALVE TOGGLE SWITCH IS IN THE ON POSITION AND THERE IS NO FLAME PRESENT THEN CHECK THE GAS VALVE OUTLET MANIFOLD PRESSURE TO DETERMINE IF THERE IS 3 5 INCHES OF WATER INWC GAS PRESSURE FOR NATURAL GAS OR 10 0 INCHES OF WATER INWC GAS PRESSURE FOR PROPANE GAS WHEN THERE IS 24 VAC PRESENT AT THE ELECTRICAL ...

Page 9: ...VAC BETWEEN BOTH CONTACTS AND COMMON AND THE COMBUSTION AIR BOOSTER MOTOR IS NOT OPERATING REPLACE THE PRESSURE SWITCH CALL FOR HEAT BURNER FLAME WILL NOT LIGHT FOUR FLASHS OPEN LIMIT CONTROL USE A VOLT METER TO CHECK FOR 24 VAC AT THE UPPER LIMIT CONTROL AND THE PRIMARY LIMIT CONTROL TO CHECK THE VOLTAGE PLACE ONE PROBE OF THE VOLT METER ON THE TERMINAL OF THE LIMIT CONTROL AND THE OTHER PROBE ON...

Page 10: ...04 2009 07 2009 ...

Reviews: