Hearthstone Quality Home Heating Products, Inc
®
Bari Model 8171
19
18.
For Ceramic or Soapstone top panels:
Install the leveling hardware for the top panel. Set top panel
on leveling hardware to test alignment. Adjust hardware to level top panel to side and front panels. (If
using a steel top, skip to step 22)
a. For a
ceramic top
, use 2x S02, 1x S03, 2x
S06, 1x S07 3x T04. Set to specified
height.
b. For a
soapstone top
, use 2x S02, 2x S04, 1x S08, 3x T04. Set to specified height.
Front screws
Rear screw
Front screws
Rear screw