
5
Hearth & Home Technologies Inc. • SFE-ST • 4050-510 Rev A • 05/08
H. Finishing and Trim
Combustible or non-combustible materials may be used to
¿
nish up to the appliance opening.
The nailing
À
anges and drywall ledge permit installation of
drywall
À
ush to the front metal frame.
Trim material can cover the metal frame creating a true
clean face installation.
Drywall Flush to Metal Frame
Trim Materials Covering Metal Frame
HOT_LINE
GROUND
NEUTRAL
M2
MOTOR
M
LD1
5 WATT LED
POWER SUPPLY
FIXED EMBER BED
AND BACK LOG LEDS
REMOTE RECEIVER
EMBER
FLAME
SFE-ST WIRING DIAGRAM
M1
MOTOR
M
LD2
5 WATT LED
LED EMBER MOTION CIRCUIT
FLAME EFFECT PROJECTOR 1
FLAME EFFECT PROJECTOR 2
LED
LED
LED
R1
LED
LED
LED
R2
WALL SWITCH
LED
LED
LED
R3
LED
LED
LED
R4
D1
1N4001
OPTIONAL WSK-21
INPUT 120 VOLT 60 HZ
25 WATTS MAX
OUTPUT
12 VDC
1.5 AMP
SFE-ST Wiring Diagram