Disc-Roller
Contour
4,5 – 5,5 – 6,5 m
20-09-2020
16
Maintenance and service
A.
After 10 hours of operation, retighten wheels, bearings and stop rings. Check hydraulic
hoses, fittings and cylinders for leaks and retighten.
B.
Every 10 hours of operation, grease all pivoting points in side sections, drawbar and wheel
assembly.
C.
After end season, grease and wash machine, and grease the piston rods.
Important:
X = Lubricating points
Oil, type Hydro Texaco HD 32 has been
filled in the hydraulic system.
Summary of Contents for Disc-Roller Contour
Page 1: ...2 Back to the table of contents Manual no 8000001 02 200920 ...
Page 17: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 17 Back to the table of contents Noter ...
Page 28: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 28 Back to the table of contents Side sections ...
Page 40: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 40 Back to the table of contents Disc ...
Page 42: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 42 Back to the table of contents Edge equipment ...
Page 49: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 49 Back to the table of contents Notes ...
Page 55: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 55 Back to the table of contents Air brakes ...
Page 62: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 62 Back to the table of contents Folding 4 5 m ...
Page 67: ...Spring Board 4 5 5 5 6 5 ...
Page 69: ...Depth controller 4 5 meter ...
Page 70: ...Debth controller 5 5 6 5 meter ...
Page 72: ...The design is subject to modification without notice ...