Dongguan HCP Technology Co., Ltd
41041 Trimboli Way, #1761, Fremont, CA 94538, USA
14
5. Install the LED Display Screen.
5.1 Install the first LED panel from the lower middle part.
Before start the steps, please wear the rubber gloves. To avoid the LED panels
to be bumped.
And notice that the LED panels must be installed carefully from the middle to
the sides, bottom up, row by row.
Adjust the flatness after each row of panels
are installed.
1-3-1
1-3-2