background image

Dongguan HCP Technology Co., Ltd 

  41041 Trimboli Way, #1761, Fremont, CA 94538, USA 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HCP Technology 

 

UFP Series 

 

User Manual 

 

 

 

 

 

 

 

Summary of Contents for UFP Series

Page 1: ...Dongguan HCP Technology Co Ltd 41041 Trimboli Way 1761 Fremont CA 94538 USA HCP Technology UFP Series User Manual ...

Page 2: ... Components 5 1 2 Tools 5 2 Install the Wall Mount Rack 6 2 1 Install the horizontal rails 6 2 2 Install the vertical rails 6 2 3 Install the lower rail 7 3 Install the LED Cabinets Frame 8 3 1 Install the shrapnel nuts and cabinet connection Plates 8 3 2 Install the cabinet frames 11 4 Connect the cables 13 5 Install the LED display screen 14 Part 3 Trouble Shooting 16 ...

Page 3: ...because of the high voltage components inside There are no user serviceable parts are inside Only qualified service personnel are allowed to service and open the unit Risk of electric shock If not in use fully disengage the power to the unit by disconnecting the power cord from the AC outlet Do not use damaged cables Check cables regularly Replace damaged cables immediately they are not user servi...

Page 4: ...1 Fremont CA 94538 USA 4 Risk of product damage due to dusty environment Do not install or operate the system in a dusty environment Risk of product damage by moisture or water Do not clean the system with water Do not wipe the LED Panel with a damp cloth ...

Page 5: ...verview 1 1 Components 1 2 Tools Shrapnel nut Rack Connection Plate Cabinet Connection Plate M8 30 40mm 90 90mm Hex Socket Head Screws Hex Socket Head Screws Hex Socket Head Screws M6 6 M8 12 M8 20 1 2 Cordless Hammer Drill Allen Key Phillips Screwdriver M5 M6 Tape Measure Spirit Level Vacuum Suction Tool ...

Page 6: ...he Wall Mount Rack 2 1 Install the horizontal rails please ensure the horizontal rails are in the same levels The spirit level shall help to adjust the rails and then use the Allen Key for locking the screws W A L L LED Display Screen 3 M8 12 Screws 2 Rack Connection Plate 1 1 Shrapnel nuts ...

Page 7: ...ongguan HCP Technology Co Ltd 41041 Trimboli Way 1761 Fremont CA 94538 USA 7 2 2 Install the vertical rails in the same manner as horizontal rails 3 M8 12 Screws 1 Shrapnel nut 2 Rack Connection Plate 2 ...

Page 8: ...gguan HCP Technology Co Ltd 41041 Trimboli Way 1761 Fremont CA 94538 USA 8 2 3 Install the lower rails in the same manner as horizontal rails W A L L 2 Rack Connection Plate 2 1 Shrapnel nut 3 M8 12 Screw ...

Page 9: ...P Technology Co Ltd 41041 Trimboli Way 1761 Fremont CA 94538 USA 9 3 Install the LED Cabinets Frame 3 1 Install shrapnel nuts and cabinet connection Plates 3 M8 12 Screws 2 Cabinet Connection Plate 1 shrapnel nut ...

Page 10: ... Frames 3 2 1 Install the first cabinet frame from the lower middle part Use a spirit level to adjust the flatness and verticality and then secure the cabinet frame to the connection plates on the rails Fixed the Cabinet Frames with the Cabinet Connection Plates M8 20mm Screws 4PCS Cabinet Frame 1 3 1 3 ...

Page 11: ... Co Ltd 41041 Trimboli Way 1761 Fremont CA 94538 USA 11 3 2 2 Repeat the above steps to install other cabinets from bottom up from the middle to the sides Cabinets frame must be installed following the number 1 1 1 2 1 3 1 4 ...

Page 12: ...ease do not fix the screws between the connection plates and cabinets frames too tight for future adjustment All the red circled parts are adjusting points Ensure that the seam and flatness between cabinets frame conform to the standard after each cabinet frame is installed Otherwise make some adjustments M6 6mm Screws 5PCS Cabinet 1 2 1 3 1 1 1 2 1 3 1 4 2 1 2 2 2 3 2 4 3 1 3 2 3 3 3 4 4 1 4 2 4 ...

Page 13: ... 94538 USA 13 4 Connection the signal cables and power cables The following two figures show the connection diagrams of UFP F1 26 LED screen The resolution is 1080P The signal cables are marked in green and the power cables in red Cabling Diagram 1 Cabling Diagram 2 ...

Page 14: ...tall the first LED panel from the lower middle part Before start the steps please wear the rubber gloves To avoid the LED panels to be bumped And notice that the LED panels must be installed carefully from the middle to the sides bottom up row by row Adjust the flatness after each row of panels are installed 1 3 1 1 3 2 ...

Page 15: ...uan HCP Technology Co Ltd 41041 Trimboli Way 1761 Fremont CA 94538 USA 15 5 2 When you remove the panels please use the professional tools carefully For example the vacuum suction tools vacuum suction tools ...

Page 16: ...winkling If not reconnect the cable The signal cable is connected wrongly Check the receving cards work normaly reconnect the signal cable according to the controlling system operation The calibration data in the screen is missing Install the panel and cabinet in order the confirm if it works normally The installations of panel and cabinet are wrong not mount in order Reupload the relative calibra...

Reviews: