A 12 Order No. BA 93-20-270 Issue 01.03.08
Setting of welding gun A 12
Plunging depth
Lift
Plunging depth
Lift
(metric/mm)
(imperial)
3
#4 or 12 gage
1,0
1,0
2,5
1,5
4
#8
1,0
1,0
2,5
1,5
5
#10 or 3/16"
1,0
1,0
2,5
1,5
6
1/4"
1,0
1,0
2,5
1,5
8
5/16"
1,0
1,0
2,5
2,0
10
7/16"
1,5
1,5
3,0
2,0
12
1/2"
2,0
2,0
3,0
2,5
Eff. diameter
Preferably under shielding gas
Preferably with ceramic ferrule
Welding element with
conical face
Welding element with
conical or
plane face
*)
When welding with shielding gas, a 10% longer time is normally selected.
When welding alloyed steel, a 10% lower current is normally selected.
The given values apply to weldings in the welding position PA. The welding time shall be
reduced for welding in the welding position PC.
In the case of short cycle stud welding, the welding time is less than 100 ms. It depends not
only on the stud diameter, but also on the available current intensity (I[A] = min. 100 x Ø (mm)).
The welding time should be as short as possible in the case of welding without weld pool
protection.
Welding energy is only selected by welding time.
Further notes on
– welding elements
– prestress at installation (tie load) and torque
– material combinations
see appendix and operating manual of the according welding
gun.
Summary of Contents for 93-20-270
Page 1: ...A 12 Welding Gun 93 20 270 Operating Manual ...
Page 45: ...A 12 Order No BA 93 20 270 Issue 01 03 08 45 Welding gun type A 12 93 20 270 ...
Page 47: ...A 12 Order No BA 93 20 270 Issue 01 03 08 47 Shielding gas tripod complete A 12 93 40 021 ...
Page 49: ...A 12 Order No BA 93 20 270 Issue 01 03 08 49 Ceramic tripod complete A 12 93 40 022 ...
Page 61: ...A 12 Order No BA 93 20 270 Issue 01 03 08 61 Service Support ...
Page 65: ......