
Mechanical installation
10
A4514-1.0
HBM: public
Z6R…
4
Mechanical installation
4.1
Important precautions during
installation
S
Handle the transducer with care.
S
Welding currents must not be allowed to flow over the
transducer. If there is a risk that this might happen,
you must provide a suitable low-ohm connection to
electrically bypass the transducer. HBM, for example,
provides the highly flexible EEK ground cable, which
can be screwed on above and below the transducer.
S
Make sure that the transducer cannot be overloaded.
WARNING
There is a danger of the transducer breaking if it is over
loaded. This can cause danger for the operating person
nel of the system in which the transducer is installed.
Implement appropriate safety measures to avoid over
loads or to protect against the resulting dangers.
Notice
Load cells are precision measuring elements and need to
be handled carefully. Dropping or knocking the trans
ducer may cause permanent damage. Make sure that the
transducer cannot be overloaded, including while it is
being mounted.
Summary of Contents for Z6R Series
Page 1: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Fran ais Z6R...
Page 3: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Fran ais Z6R...
Page 31: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Fran ais Z6R...
Page 59: ...Operating Manual Bedienungsanleitung Manuel d emploi English Deutsch Fran ais Z6R...