![HBM HBK U93 Mounting Instructions Download Page 17](http://html1.mh-extra.com/html/hbm/hbk-u93/hbk-u93_mounting-instructions_2111874017.webp)
15
U93
MECHANICAL INSTALLATION
wh (white)
bk (black)
rd (red)
bu (blue)
gn (green)
gy (gray)
ye (yellow)
Measurement signal (+) U
A
Excitation voltage (+) U
B
Sense lead (-) and TEDS*
Sense lead (+)
Excitation voltage (-) U
B
and TEDS*
Measurement signal (-) U
A
Cable shield, connected to the housing
* TEDS chip only if ordered
Fig. 7.1
U93 pin assignment (six-wire configuration)
Tip
Swap the white and red cable wires over, if you need a negative output voltage at the ampli
fier under compressive loading.
7.2.1
Connecting to terminals
1. Cut the cable sheath as shown in
, to gain access to the shield.
2. Connect the shield extensively to the housing ground.
7.2.2
Connecting to a plug
Connect the cable shield extensively to the connector housing.
Cable sheath cut open around the
circumference and pushed
forward by about 2 mm
100
10
10
2
Fig. 7.2
Cable sheath with incision
Summary of Contents for HBK U93
Page 3: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Mounting Instructions...
Page 23: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Montageanleitung...
Page 44: ...U93 OPTIONEN 22...
Page 45: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Notice de montage...
Page 66: ...U93 OPTIONS 22...
Page 67: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Istruzioni per il montaggio...
Page 88: ...HBK Hottinger Br el Kjaer www hbkworld com info hbkworld com A02081 03 YI0 02 7 0111 0005...