![HBM HBK U93 Mounting Instructions Download Page 16](http://html1.mh-extra.com/html/hbm/hbk-u93/hbk-u93_mounting-instructions_2111874016.webp)
U93
MECHANICAL INSTALLATION
14
7
ELECTRICAL CONNECTION
The transducers are delivered with a 3 m cable with free ends as standard, and the cable
terminations are color‐coded. The cable shield is connected in accordance with the
Greenline concept. This encloses the measurement system in a Faraday cage. Electro
magnetic interference cannot affect the measurement system.
Transducers with free ends must be fitted with CE‐norm connectors.
The shielding must
be connected extensively.
With other connection techniques, an EMC‐proof shield should be applied in the wire area
and this shield should also be connected extensively (see also HBM Greenline Informa
tion, brochure i1577).
7.1
Notes on cabling
S
Use shielded, low‐capacitance HBM cables only.
S
Do not route the measurement cables parallel to power lines or control circuits. If this
is not possible (in cable pits, for example), protect the measurement cable with a rigid
steel conduit, for example and keep it at least 50 cms away from the other cables. The
power lines or control circuits should be twisted (15 twists per meter).
S
Avoid stray fields from transformers, motors and contact switches.
S
Do not ground the transducer, amplifier and indicator more than once, and attach all
the devices in the measuring chain to the same protective earth conductor.
S
The connection cable shielding is connected to the transducer housing.
S
Follow the connection diagram and keep to the (Greenline) grounding concept.
S
To achieve full accuracy, a six‐wire configuration should be used for an extension
cable.
7.2
Assignment of cable wires
If the transducer is connected in accordance with the wiring diagram below (
),
when the transducer is loaded in the pressure direction, the output voltage at the ampli
fier is positive.
Summary of Contents for HBK U93
Page 3: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Mounting Instructions...
Page 23: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Montageanleitung...
Page 44: ...U93 OPTIONEN 22...
Page 45: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Notice de montage...
Page 66: ...U93 OPTIONS 22...
Page 67: ...U93 ENGLISH DEUTSCH FRAN AIS ITALIANO Istruzioni per il montaggio...
Page 88: ...HBK Hottinger Br el Kjaer www hbkworld com info hbkworld com A02081 03 YI0 02 7 0111 0005...