If the feed nut (8) is positioned on the lower part (10) of the drilling machine, interrupt the drilling 

process, loosen the drill shaft (1) by opening the clamping screw (4) and turn the feed nut (8) 

back to the red marking. Make sure that the drill shaft is NOT pulled back with it. Then fix the 

drill shaft (1) again by tightening the clamping screw (4). Then continue the drilling process as 

described.
Caution:
When the clamping screw (4) is opened, the pressure of the medium can cause the drill shaft 

(1) to suddenly extend upwards. Therefore, make sure that the clamping screw is not opened 

unintentionally during the entire drilling process.

1.3 Flushing

During and after the tapping process, the flushing tap (9) must be held in the open position until 

all residual chips have flushed out.

1.4 After drilling

After drilling, pull the drill shaft (1) back a little by 

turning the feed nut (8) to the left, open the clam-

ping screw (4) and pull back the drill spindle (1) 

completely. Flush again if necessary.
Caution: When the clamping screw (4) is opened, 

the pressure of the medium can cause the drill 

shaft (1) to suddenly extend upwards.

•  Move ZAK 69 waste water valve to closed 

 

 position

•  Dismantle drilling machine (in reverse order to 

 

 assembly)

•  Check whether the drilled out „tablet“ has been 

 

  held in the cup drill

1.5 Commissioning and pressure testing

After installation, please carry out a pressure test 

in an open pipe trench in accordance with the re-

cognised rules of technology.